On leaving, the men generally draw all their savings, and it is not
uncommon for a grateful Kafir to press £2 or £3 on Captain Dallas
in recognition of his trouble. They are astonished when their
offerings are declined; still more so when it is explained that if
they would put their savings in a bank they would have a few extra
pounds given to them for the privilege of taking care of it.
A shrewd young Pondo, who had been coming year after year, applied
for some of his savings, and gave as a reason that he wanted to buy
a wife. “But you said the same thing last year,” replied Captain
Dallas; “I hope nothing has happened.” “No,” said the man; “one
wife, she quarrel with me; two wives, they quarrel with each other;
me peace!”
UNDERGROUND WORKINGS
In the face of constant developments I can only describe the system
in use at the time of my own visits in 1896 and 1905. Shafts are
sunk in the solid rock at a sufficient distance from the pipe to
be safe against reef movements in the open mine. In 1903 the rock
shafts in the De Beers and Kimberley Mines reached depths of 2076
and 2599 feet respectively. Tunnels are driven from these shafts
at different levels, about 120 feet apart, to cross the mine from
west to east. These tunnels are connected by two other tunnels
running north and south, one near the west side of the mine and one
midway between it and the east margin of the mine. From the east
and west tunnels offsets are driven to the surrounding rock. When
near the rock the offsets widen into galleries, these in turn being
stoped on the sides until they meet, and upwards until they break
through the blue ground. The fallen reef with which the upper part
of the mine is filled sinks and partially fills the open space. The
workmen then stand on the fallen reef and drill the blue ground
overhead, and as the roof is blasted back the debris follows. When
stoping between two tunnels the blue is stoped up to the debris
about midway between the two tunnels. The upper levels are worked
back in advance of the lower levels, and the works assume the
shape of irregular terraces. The main levels are from 90 to 120
feet apart, with intermediate levels every 30 feet. Hoisting is
done from only one level at a time through the same shaft. By this
ingenious method every portion of blue ground is excavated and
raised to the surface, the rubbish on the top gradually sinking and
taking its place.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account