The project of constructing a ship canal to connect Manchester with the
sea appears to have been started just before the railway era, but it was
then abandoned, as the opening of the Liverpool and Manchester Canal
brought about an immediate reduction in the rates of carriage. Perhaps
it was the success of the Suez Canal which caused the revival of this
scheme, in 1880, combined with the depression of the cotton trade at
that period, when the Liverpool dock dues and the comparatively high
railway rates proved a heavier tax than usual on the great Lancashire
industry. The first definite steps were taken two years afterwards, when
two plans were submitted for the selection of a committee. One scheme
proposed to construct the canal without any locks; but, as Manchester is
60 feet above the sea level, there would, it was felt, be certain
inconveniences in loading or unloading ships in a deep depression. The
other plan was submitted by Mr. Leader Williams, a well known canal
engineer, who proposed to take the canal from Runcorn, a distance of 20
miles, and making use of locks. When Parliament was applied to for
powers authorizing the prosecution of the enterprise, there was, of
course, much opposition offered by the various interests involved, and
the inquires before the Committees of each House of Parliament were
unusually protracted, for they extended in all to 175 days, and the cost
to the promoters is said to have amounted to £150,000. Then, when the
Bill had passed, it was found that the capital (£8,000,000) could not be
raised owing to the financial depression, and partly also to some want
of confidence in the soundness of the undertaking on the part of the
Lancashire capitalists. But the promoters submitted the whole scheme to
a representative committee, who should consider any possible objections.
This committee reported (after sitting almost daily for five weeks) upon
every point, and were unanimous in pronouncing the undertaking to be
perfectly practicable and commercially sound. After this there was no
difficulty in raising the required capital, which was subscribed by
corporate bodies as well as private persons. The contract was let for
£5,750,000, and the work was commenced in November, 1887, the contractor
undertaking to have the canal completed and ready for traffic by January
1st, 1892.
[Illustration:
FIG. 133.—_Western Portion._
]
[Illustration:
FIG. 134.—_Eastern Portion._
FIGS. 133 AND 134.—_Map of the Manchester Ship Canal._
]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account