Great Britain. Army -- Ordnance facilities; World War, 1914-1918
In other parts the green turf of the fields is still undisturbed, but
already it is scored deep with wheel-marks, is plotted out for the
coming of the diggers and builders. By the end of spring they will
have gone, the twelve-mile stretch will be humming from end to end
with munition workers, will be pouring out in a stupendous stream the
fighting-food of the firing line. Until it is complete the daily
routine is one of constant hustle, of planning and contriving and
dovetailing one piece of work into another, of keeping each and all
hustling fast on the move. Nothing is allowed to halt or check or stay
the work; everything must give way to the need for haste. Time is
always money, but here it is more than money; it is an expenditure, not
only of money, but without stint of brain and muscle power. Work is
planned to commence by a certain date and by that date be sure it will
commence, and the Front will feel the rush of the increased torrent
that will come sluicing out from the Master Job.
There are other greatly planned and wonderfully executed works which
only in their size are outdistanced by the Master Job. I saw one such
new works, so new that in parts the fields are still scattered with
cabbage stumps or trampled turnips, so new that only at the end of this
last September was the first sod cut. The end of September--and by the
First of January the first section was due to be turning out munitions.
When I was there the big boilers of the power-station were not ready
to be installed, but a temporary boiler had been dug out from Heaven
knows where, and its chimney was pouring out smoke as the temporary
furnace prepared for a trial run. When I saw the place, only about
fifty working days had passed from the cutting of that first sod, and
yet here were rows of completed workrooms, completed in some down to
the varnished walls and the linoleumed floors, the steam-heating, and
the electric lamps over the work benches. There are a dozen 100-ton
stores, miles upon miles of raised board walks (the “clean way” that in
a works handling explosives keeps the feet of the workers out of mud or
earth or grit), of steam-heating pipes, of railway and trolly rails.
There are scores of magazines, many scores of huts and houses, railway
sidings to allow of the handling of many hundred tons a day.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account