Down Town Brooklyn: A Report to the Comptroller of the City of New York on Sites for Public Buildings and the Relocation of the Elevated Railroad Tracks now in Lower Fulton Street, Borough of BrooklynBrooklyn (New York, N.Y.). Committee of Ten
History
Down Town Brooklyn: A Report to the Comptroller of the City of New York on Sites for Public Buildings and the Relocation of the Elevated Railroad Tracks now in Lower Fulton Street, Borough of Brooklyn
Brooklyn (New York, N.Y.). Committee of Ten
Brooklyn (New York, N.Y.) -- History; Railroads, Elevated -- New York (State) -- New York
4. Polytechnic Institute and buildings fronting
on Court Street not taken by the city
for new Municipal Building site 733,700.00
-------------
Total $6,876,795.00
This plan has been pressed by very competent persons and we have given
a large amount of detailed study to its merits. It contemplates that
the old court house and municipal building should be torn down, and
that the new court house should be set far back from Joralemon Street,
the open space in front of it being flanked by the Hall of Records on
one side, and a building of corresponding design on the other, to be
used for children's and women's courts. The court house would be built
on both sides of Livingston Street, which would be double-decked so
that the noise of surface cars and vehicular traffic could not reach
the court rooms. This noise is now considerable on account of the
slight grade from the Court Street to the Boerum Place level which
requires the application of brakes on the down grade. On account of
the widening of Livingston Street this block is only 160 feet deep.
Any form of treatment would seem to be unduly expensive and even then
the court house would not be quiet, as the court rooms would be
subjected to the noise from the crossovers at the corners of
Livingston Street with Court Street and Boerum Place. The municipal
building would need to be placed on the plaza site or elsewhere. One
of the main objections to this plan is that the arrangement of all the
buildings must be on an axis that does not correspond with Borough
Hall, the park, or Washington Street, and on this account the open
place between the flanking buildings as well as the buildings
themselves would stand awry.
FIFTH PLAN
WASHINGTON STREET SITE FOR COURT HOUSE
(See diagram marked Plan 5)
1. Cost of bridge changes and re-location of
tracks as estimated by the Department
of Bridges, and assessed value of
additional property required for same $4,012,095.00
2. Assessed valuation of land and buildings between
Washington and Fulton streets 1,249,100.00
3. Site for new court house takes part of last
item.
4. Municipal Building site at south-west corner
of Court and Joralemon streets
(title now vested in the city)
-------------
Total $5,261,195.00
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account