FOUNDATION.–We may now assume that our preliminary studies relating to
the location and physical features of the dam site are satisfactory.
We must next investigate the foundation upon which the dam is to be
built. This investigation is sometimes wholly neglected or else done in
such a way as to be practically useless. To merely drive down iron rods
feeling for so-called bed rock, or to make only a few bore-holes with
an earth auger should in no instance be considered sufficient. Borings
may be found necessary at considerable depths below the surface and
in certain classes of material, but dug pits or shafts should always
be resorted to for moderate depths and whenever practicable. Only by
such means may the true character of the strata underlying the surface,
and the nature and condition of the bed rock, if it be reached, become
known. If a satisfactory stratum of impermeable material be found it is
necessary also to learn both its thickness and extent. It may prove to
be only a “pocket” of limited volume, or if found to extend entirely
across the depression lengthwise of the dam site it may “pinch out”
on lines transversely above or below. Shafts and borings made in the
reservoir basin and below the dam site will determine its extent in
this direction, knowledge of which is very important.
Fig. 1, showing a longitudinal section of the site of the Yarrow Dam of
the Liverpool Water-Works, England, illustrates the necessity of such
investigation. A bore hole at station 2 + 00 met a large boulder which
at first was erroneously thought to be bed rock. The hole at station 3
+ 50 met a stratum of clay which proved to be only a pocket.
The relative elevation of the different strata and of the bed rock
formation, referred to one common datum, should always be determined.
These elevations will indicate both the dip and strike of the rock
formation and are necessary for estimating the quantities of material
to be excavated and removed, including estimates of cost. They furnish
information of value in determining the rate of percolation or
filtration through the different classes of material and the amount
of probable seepage, as will appear later. The cost of excavating,
draining and preparing the floor or foundation for a dam is often very
great, amounting to 20 or 30% of the total cost.
Fig. 2 is a transverse section of the Yarrow Dam. This particular dam
has been selected as fairly representative of English practice and
of typical design. It is one of the most widely known earth dams in
existence.
[Illustration: FIG. 1.–LONGITUDINAL SECTION OF YARROW DAM SITE.]
[Illustration: FIG. 2.–CROSS-SECTION OF YARROW DAM.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account