Mr. John Newman, in his admirable treatise on “Earthwork Slips and
Subsidences upon Public Works,” classifies and enumerates slips as
follows:
Natural causes, 7.
Artificial causes, 31.
Additional causes due to impounded water, 7.
After describing each cause he presents 39 different means used to
prevent such slips and describes methods of making repairs.
Mr. Wm. L. Strange has had such a large and valuable experience and has
set forth so carefully and lucidly both the principles and practice of
earth dam construction, that the writer takes pleasure in again quoting
him on the subject of _drainage_, of which he is an ardent advocate. He
says that,
thorough drainage of the base of a dam is a matter of vital
necessity, for notwithstanding all precautions, some water will
certainly pass through the puddle.
It is at the junction of the dam with the ground that the maximum
amount of leakage may be expected. The percolating water should be
gotten out as quickly as possible. The whole method of dealing with
slips may be summed up in one word–_drainage_.
The proper presentation of these two phases of our subject would in
itself require a volume. The interested reader is therefore referred to
the different authorities and writers cited in Appendix II.
Jerome Park Reservoir Embankments.
The Jerome Park reservoir is an artificial basin involving the
excavation and removal of large quantities of soil, and the erection of
long embankments with masonry core walls, partly founded on rock and
partly on sand. The plan and specifications call for an embankment 20
ft. wide on top, with both slopes 2 on 1, and provide for lining the
inner slope with brick or stone laid in concrete, and for covering the
bottom with concrete laid on good earth compacted by rolling.
[Illustration: Section at Sta. 99.]
[Illustration: Section at Sta. 76+20.
FIG. 20.–GRAPHICAL EXHIBIT OF STUDIES OF JEROME PARK RESERVOIR
EMBANKMENT.]
Wherever bed rock was not considered too deep below the surface the
core walls were built upon it. In other places the foundation was
placed 8 to 10 ft. below the bottom of the reservoir and rested upon
the sand.
It appears that the plans of the Jerome Park embankment were changed
from their original design, prior to the report of the board of
experts, on account of two alleged defects, namely, “cracks in the core
wall” and “foundation of quicksand,” and incidentally on account of the
supposed instability of the inner bank.
In describing the materials on which these embankments rest the experts
remarked
that all these fine sands are unstable when mechanically
agitated in an excess of water, and that they all settle in
a firm and compact mass under the water when the agitation
ceases. That they are quite unlike the true quicksands whose
particles are of impalpable fineness and which are “quick”
or unstable under water.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account