THE FRENCH DESIGN.–Fig. 27 is an enlarged section of the original
design of the new French Co. This design has no core wall, but at
the up-stream toe a concrete wall was to be built across the river
between the two lines of sheet-piling. At the down-stream toe a large
amount of riprap was to be placed to prevent destruction of the dam
during construction. In this case it would be necessary to construct
a temporary dam above and also to use the excavation for the locks
as a flood spillway. This method would involve considerable risk to
the work, on account of the large volume of flood waters it might be
necessary to take care of during construction.
ISTHMIAN CANAL COMMISSION.–The dam proposed by the Isthmian Canal
Commission is shown by Fig. 28. This was designed to be an absolutely
water-tight closure of the geological valley, by using a masonry core
wall carried down to bed rock. The maximum depth being 129 ft., it was
planned to rest the concrete wall on a series of pneumatic caissons
reaching to rock. The spaces between the caissons would be closed and
made water-tight. Both slopes of the earth embankment were to have
horizontal benches and be revetted with loose rock.
MR. MORISON’S DESIGN.–To appreciate fully the object and aim of the
third design, Fig. 29, which may be called a new type, although similar
in many respects to the North Dike of the Wachusett reservoir already
illustrated and described, it should be stated that the equalized flow
of the Chagres River is put at 1,000 cu. ft. per sec. Of this quantity
it is estimated that 500 cu. ft. would be needed for lockage and 200
cu. ft. for evaporation. This leaves 300 cu. ft. per sec. available for
seepage and other losses or to be wasted.
[Illustration]
[Illustration]
[Illustration: FIGS. 27 TO 29.–DESIGNS FOR THE BOHIO DAM, PANAMA
CANAL.]
It will thus be seen that a scarcity of water is not in this instance
a condition demanding an absolutely water-tight dam. The amount of
seepage permissible without endangering the stability of the structure
is the real point now to be discussed.
The third design, which was proposed by Mr. Morison, is shown by Fig.
29. The topography and configuration of this dam site is not unlike
that of the San Leandro Dam, California, soon to be described, while
the general design is similar, as has been remarked, to the North Dike
of the Wachusett Reservoir.
This third design contemplates a compound structure, formed by two
rock-fill dams situated about 2,120 ft. apart, with the intervening
space filled with loose rock, earth and other available material.
Immediately below the upper and higher rock-fill dam, it is proposed
to place across the canyon a puddle wall 50 ft. in width, resting over
two lines of sheet-piling 30 ft. apart. This piling would probably not
reach farther than 50 ft. below tidewater, the solid rock floor being
about 100 ft. deeper.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account