In determining the character and suitability of materials for
constructing a dam it is necessary to make a careful study of the
soil and geological formation. This is best accomplished by digging
numerous test pits over the basin, especially in the vicinity of the
proposed dam site; borings alone should never be relied upon for this
information. For such an investigation the advisability of borrowing
material for dam construction from the reservoir basin is determined.
The porous character of the subsoil strata, or the dip and nature of
the bed rock, may forbid the removal of material from the floor of the
basin, even at a remote distance from the dam site.
The area to be flooded should be cleared and grubbed more or less
thoroughly, depending again upon the use for which the water is
impounded. In no instance should timber be left standing below the
high-water level of the reservoir; and all rubbish liable to float and
obstruct the outlet tunnel and spillway during a time of flood should
be removed.
The accessories to a reservoir, to which reference has been made, may
be enumerated as follows:
1. Outlet pipes or tunnel.
2. Gate tower, screens and controlling devices.
3. Sluiceways for silt or sand.
4. Wasteway channel or weir.
5. Cover, settling basin, aerating devices, etc.
Some of these are necessary and common to all classes of reservoirs,
while others are employed only in special cases, as for domestic water
supplies. All reservoirs formed by earth embankments must have at least
two of these, namely a wasteway, which is its safety valve, and outlet
pipes or outlet tunnel.
It may be stated that the proper location and construction of the
outlet for a reservoir are of vital importance, since either to
improper location or faulty construction may be traced most of the
failures of the past. It is almost impossible to prevent water under
high pressure from following along pipes and culverts when placed in an
earth dam. The pipes and culverts frequently leak, and failure ensues.
Failure may result from one or more of the following causes:
1. By improper design and placement of the puddle around the pipes.
2. By resting the pipes upon piers of masonry without continuous
longitudinal support.
3. By reason of subsidence in the cuts of the embankments and
at the core walls, due to the great weight at these points.
4. Leakage due to inherent defects, frost, deterioration, etc.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account