Earthwork
Every effort should be directed to make the drainage of the same degree
throughout the area; it is therefore necessary to know whether the water
can be discharged into a channel or adjacent river, or if the bottom of
the drains will be above the general water-discharge level of the
district so as to prevent the ground being in the condition of a sponge
always full of water and becoming a floating mass. When the peat soil is
of little depth and rests upon sand or clay, drainage can be effected by
side drains reaching to the underlying stratum, and the drains can be
open and be filled with gravel to prevent the sides falling or the
bottom rising. Few serious slips will take place in bog-land when the
precautionary works named in this chapter are more or less executed;
subsidence is then the chief difficulty. It cannot be entirely
prevented, but it may be lessened. It is frequently very considerable,
depending principally upon the depth, situation, and character of the
deposit and the proportion of water in it. Deep bog-lands upon being
drained have subsided as much as 4 to 5 feet the first year, and 10 to
12 feet the second, and in the worst situations they will continue to
subside until the earth is sufficiently compact to support the insistent
weight, and they have sunk as much as 30 feet before the ground became
consolidated. Burnt ballast, fine gravel, or sandy gravel, is to be
preferred as ballast upon peat embankments, as affording an even coating
and tending to consolidate the earth, whereas broken rock ballast breaks
up the surface, as the pieces are not uniform in size and are
fragmentary. The cost of maintenance on bog or marsh-land is sure to be
heavy for two or three years, but then the road will generally have
become firm. The chief points in maintenance are to cause equal loading
and to promote thorough drainage. Baulks laid under the sleepers, or the
longitudinal system of permanent way, is not advantageous in soft soil,
and even should a longitudinal bearer be placed upon the cross sleepers
the road is difficult to lift or pack, and less timber will be required
by a reduction of the distance between the cross sleepers. The rail
joints should also be stiffened so as to make the depth of the
undulations consequent upon the passage of a train as regular as
possible, and the number of the sleepers can be increased with this
object.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account