Earthwork Slips and Subsidences upon Public Works: Their Causes, Prevention, and ReparationNewman, John
Science
Earthwork Slips and Subsidences upon Public Works: Their Causes, Prevention, and Reparation
Newman, John
Earthwork
As a rule, an embankment across an estuary with one or two openings in
it is to be avoided, and it should be most carefully considered whether
it will not be better to expend a larger sum and erect a pile viaduct
which will not interfere with the currents or channels and only require
ordinary precautions to be taken against erosion, instead of depositing
an embankment with openings at the channels and the necessary protective
works which may consist of pitching the slopes, covering them with
fascines, mattress work, or sods, erecting short or long, low or high,
groynes, as the former may be ineffectual in causing a deposit or a
shoal in front of the toe of the slope and in preventing scour, for in
loose silty and sandy soil of considerable depth and not sufficiently
firm to resist erosion, they will probably fail by reason of the space
between them being washed away; and a complete covering of the foreshore
may be requisite, or a protecting apron of homogeneous impermeable soil,
and continuous training walls to prevent the creation of shoals: all of
which protective works will constantly need to be repaired, and the
failure of any one may cause not only an embankment to give way but the
remaining preservative works. Undoubtedly there are many estuaries upon
which if an embankment even with many openings for channels had been
deposited, it would have failed, the soil being in such a tender state
that the least additional weight upon the surface would destroy the
equilibrium. Also interference with the littoral currents is a risky
operation in any but a hard rock bed as regards the foundations, quite
apart from injury to navigable channels. When there are numerous
ditches, creeks, or channels crossing the line of a proposed estuary
embankment of variable stability, especially should hills be near and
the earth be so porous as to be saturated every tide, without doubt the
safer plan is to erect a low viaduct, as the old waterways will be an
endless source of trouble should the ground be anything but firm clay,
and interference with the currents will not be preventable, as either
their velocity will be increased or decreased, the result being scour or
fresh deposits which will affect the channels; and such alteration may
change the direction of the motion of the waters, which must be
prevented in front of an estuary embankment; or waves will be created by
the water travelling and rushing over shoals, for the even configuration
of the bottom is a wave lessener, and should there be a deep channel
near an estuary embankment severe wave action may be created. The piers
or piles of such a viaduct should be cylindrical, thus offering no flat
surface for the waves to break against, and yet temporarily to divide
them without serious shock to a structure. When of very considerable
length, a projecting embankment deposited upon a flat shore of a tidal
estuary has caused a heaping up of the water on one side at low tide,
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account