and therefore it is unequally strained. This was found to be the case
with an estuary embankment on the Scheldt, 2½ miles in length.
The form of the slope has also to be considered, but all the principles
that determine the best profile in each case of a pier or breakwater do
not necessarily apply to an embankment in an estuary. The recoil of the
waves washing away the ground in front and at the toe is particularly to
be guarded against, and the action of spray or a broken mass of water
falling upon the formation, as also the direct action of the waves. A
concave form should not be adopted throughout, as waves roll up until
they approach the top portion, when they turn over and fall upon the
flatter portion and often breach it, but when the face is straight,
excepting for a few feet at the toe, the waves are diffused in
travelling up, although they proceed to a higher point upon a flat slope
than a steep one, and the recoil is greatly diminished, but with the
view of avoiding direct wave action, when the ground is inclined in
front of a sea or estuary embankment, it is well to curve the lower part
of the slope and to make it cycloidal to the surface of the ground and
the slope for a little distance, so as to reduce obstruction to a
minimum. The method of making a level terrace or stepping the slope
instead of a curved face has the advantage of checking the rising of the
sea up the face, altering its direction and acting as a wave-breaker,
and also combines these effects with giving as large an area of the base
as can be obtained by a curved face, and in bringing the centre of
gravity of the cross section of the embankment nearer to the seat, but
the face must be securely protected. The width of the cess should
increase according to the degree of exposure. If an embankment consists
of earth the slope of the cess should be from 6 to 10 to 1, or the
system is better avoided and a continuous face adopted.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account