Earthwork Slips and Subsidences upon Public Works: Their Causes, Prevention, and ReparationNewman, John
Science
Earthwork Slips and Subsidences upon Public Works: Their Causes, Prevention, and Reparation
Newman, John
Earthwork
The discharge channel of any underground waters likely to disturb the
foundations should be discovered, and when there are adjacent hills, by
tracing their dampest part the probable direction of the surface flow
may become known. Inquiry should be made to find out whether any borings
have been made over the site in order to determine if the “boils” have
been artificially created or are natural blow-wells, in which the water
rises over the top and can, perhaps, be led away by gravitation. It is
advisable to fill every bore-hole with Portland cement mortar before any
excavation is commenced, or they will burst out when the surrounding
ground is disturbed. Bags containing shot have been used to help to
close a hole, but a preferable method is to insert a pipe down the bore,
it having been previously cleared of all dirt; and to fill it with neat
Portland cement mortar, the tube being raised as the hole is filled.
Such a method, although successful with small holes, is useless in the
case of “blows” of the ordinary size. A permanent shaft or cylinder is
then necessary.
With regard to the treatment of “boils” in foundations, when in the
possession of the information hereinbefore named it may indicate a
remedy either for “boils” in which the cause of disturbance is at a
considerable depth and the head and fall of water moderately large, or
when the agitation is merely superficial, which may result from the
range of the tidal waters or the want of surface drainage.
When a “boil” is of the first order, it is useless attempting to simply
stop it by force and prevent the issue of water, as such a method of
procedure would result in merely diverting the disturbance, and in
addition leave a weak place in the foundations; however, if many “boils”
appear, and the disintegrating agency of the water is removed either by
conducting or diverting the flow from the site, they can then be filled,
and it should be simultaneously effected, or any mere exudation in the
whole of the “boils” may become increased in one or two to a flow
sufficient to cause a slip or instability, and any concentration of the
discharge may produce movement of the ground. Small springs or “boils”
have been sufficiently arrested by depositing clay over them, excavating
it, and putting in the foundations very promptly and before the “boil”
burst out again; such treatment, however, may lead to the backing of a
wall becoming saturated and the water being dammed up: on the other
hand, the “boil” may be sealed and the water flow away in the original
underground channels; also when a “boil” is tapped it may induce an
increased flow of the underground waters, for they will find the course
of least resistance; and should they reach a fine sand stratum will
filter through and set it in motion, provided the head is sufficient to
overcome friction; and the support rendered to any overlying stratum
will therefore be destroyed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account