In the event of there being only one “boil,” but that of important
extent, perhaps the best way to proceed is to place clay upon the
surface for a few feet around it, the weight of which should not be less
than the normal pressure of the earth removed by excavation, _vide_
Chapter V.: and by the insertion of a cylinder, with a properly designed
bottom, to prevent the issue of soil to a level some feet below the
lowest intended excavation upon the site, or to the depth at which the
greatest flow of water is obtained; care being taken that no run of sand
or soil is allowed and that the water is not charged with earth, either
by a thick gravel layer until the sand ceases to pass through it, or by
other means, remembering that the motive power of running sand is that
of the pressure of water. The flow should be gently led away, if
necessary, to a sump, and discharged by pumping, thus draining the
works. The sump should always be lined, not only to prevent any flow
upon or into the surface causing saturation, but so as to control and
regulate the water some feet below the lowest level of the foundations,
the great point being to draw downwards the water from the earth and
then to carry it away. An iron or wooden cylinder sump is to be
preferred to one constructed of sheet piles or timber-lined, as the soil
may be so loose that any shaking or vibration should not be allowed, and
a close joint is not easy to attain in timber pile work. It is well to
deposit some clay puddle for a little distance round the sump after
sinking it in order to weight the soil and steady the cylinder. When a
discharging outlet has been made it should be maintained in perfect
condition, or a slip or subsidence may occur from leakage or diversion
of the flow. It may also happen that no discharge is necessary, for if
the “boil” is only, as it were, of local extent and caused by a weak
vein in otherwise stable soil, the water may rise to the head level and
there remain; the equilibrium being restored which had been destroyed by
reason of the upper strata of an impervious character being excavated.
The removal of the normal pressure upon the loose soil to some extent,
liberates the water, and the head ceasing to be balanced by it, the
earth cannot do otherwise than allow water to upraise it. A calculation
of the weight of the earth removed may give an indication within which
will be the probable head level of the supply, and usually it is much
below a head of water that would equal the normal pressure of the soil.
Supposing the weight of the earth to be twice that of water, when 10
feet of soil is excavated before a “boil” began, its removal would
approximately be equivalent to a 20 feet head of water.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account