The advantages of gabion revetment are very great. It can be put in
place without extra labor, faster and with less exposure than any
other. It is self-supporting and gives cover from view and partial
cover from fire quicker than any other form. Several forms of gabions
made of material other than brush have been used. Some of them are
sheet iron, empty barrels and hoops. The disadvantages of iron are that
it splinters badly, is heavy, and has not given satisfaction. If any
special materials are supplied, the methods of using them will, in view
of the foregoing explanation, be obvious.
_Timber or Pole Revetment._—Poles too large for use in any other way
may be cut to length and stood on end to form a revetment. The lower
end should be in a small trench and have a waling piece in front of
them. There must also be a waling piece or cap at or near the top,
anchored back. Plate 38 shows this form.
_Miscellaneous Revetments._—Any receptacles for earth which will make a
stable, compact pile, such as boxes, baskets, cans, etc., may be used
for a revetment. Canvas or burlap stretched behind pickets is being
used to a great extent on the battle fronts of Europe. If the soil will
make adobe, an excellent revetment may be made of them, but it will not
stand wet weather.
[Illustration: PLATE 38.—Timber revetment.]
CHAPTER VII
Working Parties
The infantryman will always be called upon to construct the trench
which he is to occupy. Each company is provided with portable tools,
which the men carry, and each infantry regiment is provided with tools
for the purpose. The digging tools consist of picks and shovels.
When it has been decided to locate fire trenches along a certain
line officers will lay out the cutting lines and mark them with tape
or otherwise. A company will be assigned for the construction of a
definite section of the trench.
Let us work out the procedure, assuming that the work may go on
unmolested by the enemy. Such, however, is not usually the case. The
enemy will do anything in his power to prevent construction work. If,
however, we are familiar with the details of the work and know how
to go about it in an orderly and systematic manner under conditions
of noninterference by the enemy, we will be able to carry out these
details of organization and procedure under more or less trying
conditions when the time comes.
Officers have established the trace of the trench and marked the
cutting lines. It is the ordinary traversed type, 18 feet bays with
traverses 5 feet wide and 5 feet deep, as shown in Plate 14.
The company is composed of, say twelve squads organized into three
platoons of four squads each. Six bays of the trench have been assigned
to the organization for construction. This gives a task to each platoon
of two bays, including one complete traverse and a half traverse on
each flank.
Tools have been issued to the first and third squads of each platoon,
the front rank men carrying picks and the rear rank men shovels.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account