I wish to acknowledge my obligation to Elliott Brothers for their
cordial co-operation, their excellent system of manufacture, and the
intelligent skill of their workmen, by one of whom the swiveling
connection of the levers with the piston-rod was devised.
The indicator was improved in other important respects, but I here
confine myself to the above, which most directly affected its accuracy.
This soon became established in the public confidence. During my stay
in England, about five years longer, the sale of indicators averaged
some three hundred a year, with but little variation. The Elliotts
then told me that they considered the market to have been about
supplied, and looked for a considerable falling off in the demand, and
had already reduced their orders for material. Eight years after my
return I ordered from them two indicators for use in indicating engines
exhibited at our Centennial Exhibition at Philadelphia. The indicators
had from the first been numbered in the order of their manufacture.
These came numbered over 10,000.
The indicators were put on the market in the spring of 1863, and I
sought opportunity to apply them on locomotives. In this I had the
efficient co-operation of Zerah Colburn, then editor of _The Engineer_.
The first application of them was on a locomotive of the London and
Southwestern Railway, and our trips, two in number, were from London
to Southampton and return. The revelations made by the indicator were
far from agreeable to Mr. Beattie, the chief engineer of the line. Mr.
Beattie had filled his boilers with tubes ⁷⁄₈ of an inch in diameter.
The diagrams showed the pressure of blast necessary to draw the gases
through these tubes to average about ten pounds above the atmosphere,
the reduction of the nozzles producing this amount of back pressure
throughout the stroke. Another revelation was equally disagreeable.
The steam showed very wet. We learned that Mr. Beattie surrounded his
cylinders with a jacket. This was a large corrugated casting in which
the cylinder was inserted as a liner. To keep the cylinder hot the
_exhaust_ was passed through this jacket. Mr. Colburn made both of
these features the subjects of editorials in _The Engineer_, written
in his usual trenchant style. The last one was entitled “Mr. Beattie’s
Refrigerators,” and produced a decided sensation.
Our next trips were made on the Great Eastern Road, one from London to
Norwich and one from London to Great Yarmouth. On these trips we were
accompanied by Mr. W. H. Maw, then head draftsman of the Great Eastern
Locomotive Drawing Office, under Mr. Sinclair, the chief engineer, and
by Mr. Pendred. These gentlemen were afterwards, respectively, the
editors of _Engineering_ and _The Engineer_.
[Illustration: Diagrams from English Locomotives taken with Richards
Indicator.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account