At the northern side, the slope down commences near the East India
Dock entrance, and turns out of the East India Dock Road. The slope
is fairly gradual—about one in thirty-four—and it passes under the
Blackwall line of the Great Eastern Railway, and near to Poplar
Station. The part of the tunnel near to this point—that is the part
between the river and the open slope—was executed by what is called
“cut and cover” work—that is, a huge trench was dug, then arched in and
covered over.
“Cut and cover” work also took place on the south side; and there, at
the foot of an immense excavation ninety feet down, and with its sides
held up by huge timbers, might have been seen a river of water which
had drained in and was being pumped up quickly by powerful machinery.
Not far distant, the shaft was being sunk for the staircase. In
principle, the sinking of the shaft was conducted much as Brunel’s
shaft at the Thames Tunnel, only it was built up of iron instead of
brick. Imagine a big gasometer with a scaffold near the top, where men
are busy building the walls higher and higher by adding on plate after
plate of iron. On reaching the scaffold you find that there are two
great cylinders of iron, one standing inside the other, and concrete
is being filled in between them. Men also are down below digging out
the earth which is being swung up in iron buckets; and as the soil is
gradually removed, the immense double iron and concrete cylinder slowly
sinks by its own weight.
In this manner, the great shaft was sunk nearly ninety feet, and within
it the staircase has been built, giving entrance for foot passengers,
not far from the river. Thus, on either side are sloping entrances to
the tunnel, and also, nearer the water, stairways of descent down great
shafts.
Engineers have also found their way beneath other great English
rivers—the Severn and the Mersey. Much water had to be dealt with
in the cutting of the Severn Tunnel. This important work, four and
one-third miles long, was driven in some places forty-five feet under
sandstone, and at the Salmon Pool—a hollow in the river bed—the tunnel
was thirty feet under soil called trias marl. Much greater space,
therefore, exists here between the tunnel and river than at Blackwall.
But the river burst through. The work was begun in 1873, and completed
in 1886.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account