Engineers and their triumphs: the story of the locomotive, the steamship, bridge building, tunnel makingHolmes, F. M. (Frederic Morell)
History
Engineers and their triumphs: the story of the locomotive, the steamship, bridge building, tunnel making
Holmes, F. M. (Frederic Morell)
Engineering; Engineers
Six years after its commencement the tunnel was drowned, so to speak,
for a long time by a large spring of water which burst out from
limestone, and arrangements had to be made to provide for this flood.
It is now conducted by a subsidiary tunnel or channel to a huge shaft,
where it is raised by pumps of sufficient strength. Then there was the
perilous Salmon Pool to be dealt with. The river burst through here,
and the rent had to be stopped with clay. The tunnel is twenty-six
feet wide by twenty feet high, and is cut through Pennant stone,
shale, and marl. It is lined with Staffordshire vitrified bricks
throughout—seventy-five million bricks it is estimated being used. The
works are ventilated by a huge fan, and pumping continually proceeds,
something like twenty-six million gallons of water, it is said, being
raised in the twenty-four hours. The tunnel, of which the engineers
were Messrs. Hawkshaw, Son, Hayter & Richardson, and Mr. T. A. Walker,
Contractor, is for the use of the Great Western Railway, and saves
that Company’s Welsh and Irish trains to Milford a long way round by
Gloucester.
[Illustration: THE BORING MACHINE USED IN THE PRELIMINARY CONSTRUCTION
OF THE ENGLISH CHANNEL TUNNEL.]
In cutting the Mersey Tunnel, which was completed in 1886, machinery
was used for some of the work. The machine bored partly to a diameter
of seven feet four inches, but hand labour had to be largely depended
upon. The plan pursued was to sink a shaft on either side of the
river and drive a heading, sloping upward through the sandstone to
the centre; this heading acting as a drain for any water which might
appear. The thickness between the arch of the tunnel and the river bed
is thirty feet at its least, and the tunnel, which occupied about six
years in construction, and of which the engineers were Messrs. Brunlees
& Fox, is provided with pumps raising some thirteen million gallons
of water daily. As in the case of the Severn Tunnel, ventilation is
provided for by huge fans.
A boring machine was also used in the preliminary efforts for the
construction of a tunnel under the English Channel. Holes, seven
feet across and to the length of 2000 yards, have been bored by a
compressed air machine, working with two arms furnished with teeth of
steel. The construction of the tunnel is held to be quite feasible from
an engineering point of view, and it is believed that it would pass
through strata impervious to water, such as chalk marl and grey chalk.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account