III. At this period (_c._ 1260) we must think of York Minster as
possessing the present spacious transept, a Transitional choir of
the character of that of Ripon, and a Norman nave. When the work of
rebuilding was resumed, the Transitional choir—which must have been
spacious and convenient—was spared once more, and the canons proceeded
to take down and rebuild the Norman nave, laying the foundation stone in
1291, and beginning at the south-east. The new nave is so exceedingly
broad and lofty that it is probable that it was built round and over the
top of the old Norman nave. The money came from “indulgences, penances,
briefs, bequests, and offerings at the shrine of St. William.” The nave,
like the whole minster, is exceedingly impressive in the vastness of
its spaces: no building of such dimensions could fail to be impressive.
Its proportions, however, are not good. The broadest cathedral nave in
England (its span is 45 feet), and the loftiest (it is nearly 100 feet
high), it ought to be one of the longest, which it is not: it is even
shorter than the transept. Matters are made worse, as in Lincoln nave, by
the wide spacing of the piers, the result of which is greatly to reduce
the apparent length of the nave. It contains only eight bays. Had it been
divided into ten or more bays, it would have looked far longer. It was
designed not so much on architectural lines as a glass-house. The canons
wanted the greatest possible breadths of stained glass in aisles and
clerestory. The error was seen and corrected in the choir, which, though
no longer than the nave, has nine bays instead of eight. It is possible
that nothing but want of funds prevented the canons from continuing the
nave farther westward. The exceptional height and breadth of the nave
made it very costly; and the funds plainly ran short, for, though begun
in 1291, it was not roofed till 1360. To make matters worse, the canons
were building a new chapter-house and vestibule at the same time as the
nave: so that funds may well have failed. Nevertheless, at Ely, equally
large works were completed before 1360, though they were not commenced
till 1321, and were executed with much greater richness of detail than in
York.
[Illustration: CHAPTER-HOUSE]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account