English Cathedrals Illustrated: Second and Revised EditionBond, Francis
History
English Cathedrals Illustrated: Second and Revised Edition
Bond, Francis
Cathedrals -- England; Cathedrals -- Wales
A very curious and bold specimen of mediæval engineering may now be
mentioned. If the western bays of the great transept next to the
central tower be examined, it will be seen that in the clerestory and
in the triforium these bays are exceedingly narrow, but that in the
ground-story the narrow arch corresponding to the narrow bays of the
triforium and clerestory has been moved, and a wider arch substituted.
The fact is, when the transept was completed, the Norman nave, which
was still standing, had a very narrow aisle. Consequently the builders
of the transept built a pair of narrow arches, on either side of the
central tower, leading from the transept into the Norman aisle. Later on,
as we have seen, the Norman nave and aisles were pulled down, and the
present nave was built. Its aisles are exceptionally broad. The result
was that the piers of the two narrow arches found themselves in the very
middle of the new broad aisles of the nave—a most awkward obstruction
to processions passing from aisle to transept, or _vice-versa_. So the
triforium and clerestory was underpinned, the Lancet piers next to the
tower were taken down and then put up again clear of the aisles, and the
two arches also on either side of the tower were taken down and rebuilt
with the same stones, each in the place of the other. The result is
that, counting from the end-walls of the transepts, in the triforium and
clerestory there are three of the bays wide and one narrow, while in the
ground-story there are two wide, one narrow, and one wide bay. Similar
changes took place on the eastern side of the transept when the choir was
built.
Later on, when the central tower was built, its great weight sank the
piers on which it rests eight inches into the ground, and the adjoining
masonry was dislocated. The result was that it was found necessary to
rebuild the third piers on both sides of both transepts (counting from
the end-walls) as well as the first pier on the western side of the north
transept, and at the same time to block up all the four narrow arches
with solid masonry (cf. CARLISLE, and EXETER).
IV. The west front of the nave was not finished till the very end of
the Curvilinear period, to which period belong also the treasury and
sacristy, and also Archbishop Zouch’s chapel, unless the latter was
rebuilt _c._ 1396.
[Illustration: CHAPTER-HOUSE ARCADE.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account