Since that time, the work has been conducted by the Commissioners, under
the immediate superintendence of Mr. Thomas Doane, chief engineer, in
such manner and with such progress as to give very general satisfaction
to the friends of the enterprise, and promise its completion within a
reasonable time. A very considerable portion of the labor and
expenditures, since the operations were resumed, have been applied to
preparing buildings and machinery, to the construction of a dam across
the Deerfield river, in order to secure power to operate the tunneling
apparatus, and to an enlargement and an alteration of the grade of the
Eastern end of the tunnel, which had been excavated by Haupt and
Cartwright.
But before proceeding to consider the present condition and prospects of
the Tunnel, it is necessary to revert to the legislation of 1862 and
1863, in order to note the tactics of its enemies, who had by no means
been idle, nor had in any degree relaxed their opposition. In fact, it
was through this opposition that the act of 1862 was effected, the bill
being a substitute for that reported by the committee, and generally
regarded as a compromise between the friends and foes of the enterprise,
though the latter believed they had, at last achieved a triumph, and
exultingly whispered that the great Hoosac Tunnel scheme had received
its death blow. They certainly did play their game with boldness and
skill. While the contractors, Messrs. Haupt & Co., had actually applied
all their private means, to the extent of more than $200,000, to carry
on the work, it was asserted that they were swindling the State and
pocketing its funds to the tune of $300,000. They proclaimed that they
were in favor of the Tunnel, and only desired to take the work from the
hands of swindling contractors and the control of a bankrupt and
irresponsible corporation, in order that it might be assumed and
prosecuted by the Commonwealth; but they were secretly confident, and
not without reason, that a board of commissioners would be appointed who
would report against the prosecution of the work by the State. Of the
three gentlemen appointed, not one had expressed an opinion in favor of
the enterprise, and Mr. Brooks, the president, was known to be opposed
to it. Both of the two resident members were from localities where the
prevailing sentiment was against the Tunnel. But this adroitness of the
opposition was baffled, and its confident hope disappointed by the
integrity and fairness of Mr. Brooks and his associates. The latter had
no prejudices to conquer, and Mr. Brooks had not applied himself many
weeks to the duties of his commission, before he was convinced of the
feasibility of the work, and satisfied that the State ought to assume
and complete it. When their report was made to the Legislature in 1863,
the old opposition manifested itself with more intensity than ever, and
the same honest gentlemen, who, the year before, were so friendly to the
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account