Fatigue study : $b the elimination of humanity's greatest unnecessary waste. A first step in motion studyGilbreth, Lillian Moller
Science
Fatigue study : $b the elimination of humanity's greatest unnecessary waste. A first step in motion study
Gilbreth, Lillian Moller
Fatigue; Industrial efficiency; Motion study
It is of fundamental importance in making an investigation of this type
that the allowance for fatigue be greater than the physical condition
of the worker at the end of the day seems to indicate necessary.
It is also fundamental that the results of the investigation be at
once incorporated into actual shop practice. If each member of the
organization is at once placed under such working conditions that he
can enjoy the rest periods along with the high pay that comes from
a large product, he will co-operate most fully in the progressive
work of fatigue elimination. It is a fundamental rule of scientific
management that the rate once set must never be cut. It should also
be a fundamental principle of our management that rest periods once
established should not be abolished or shortened. Let the error, if
error there is, always result to the advantage of the worker, never
to that of the employer. If you have not allowed enough rest, make
the allowance larger, then reinvestigate. If you have allowed too
much rest, let the job stand as one to be given for special merit, and
attack some other problem. The result will be an increased co-operation
which will more than compensate for the occasional over allowance for
fatigue.
Summary.
Fatigue measurement, as applied to the industries, is a new science. It
is being developed through a study of the data of activity. The methods
of measurement of activity are motion study, micromotion study, the
cyclegraph, the chronocyclegraph, and the penetrating screen. Through
the data derived by these, we standardize motion paths, motion habits,
and all other motion variables. These enable us to test and classify,
select and place, both work and workers, and to eliminate unnecessary
fatigue. Through the time element we compare our various data, and
finally arrive at results that enable us to standardize work and rest
periods. Any errors in length of rest periods must result to the
advantage of the worker.
CHAPTER VIII
MAKING ADJUSTMENTS: HOW PRESENT PRACTICE IS DEVELOPED INTO STANDARD
PRACTICE
A Concrete Example of Making Adjustments.
In order to make plain exactly how changes are made and take place from
the condition before analysis, measurement, and synthesis are made to
the standard method of doing the work, we shall take a concrete example
and consider it from every phase. This concrete example will be the
assembly of a braider or machine for manufacturing braid, which is a
standard product of the New England Butt Company. With the co-operation
of Mr. John G. Aldrich, who has since become president of the company,
the problem of assembling a braider was studied, both in the laboratory
and in the shop.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account