Genius rewarded : $b The story of the sewing machine — John Shaqi
Genius rewarded : $b The story of the sewing machineScott, John
History
Genius rewarded : $b The story of the sewing machine
Scott, John
Sewing machines -- History; Singer, Isaac Merritt, 1811-1875
The larger parts of the machine having now been japanned and ornamented,
are brought to the “Assembling Room,” and at the same time the small
working parts are brought from the Stock Room, and here all these parts
are “assembled,” or brought together, and each placed in its proper
position within or upon the machine head. Each of these parts has been
so nicely fitted, and so accurately worked by the machinery which made
it, that when the numerous and varying pieces come together in the
assembling process, it requires little and often no adjustment whatever,
and each fits in the place made for it, resulting in a complete and
harmonious whole. Connecting with this Department is the Adjusting
Department, where long rows of machines on benches are being run by
steam at a very high rate of speed. This is yet another of the many
testing processes through which your family “Singer” has gone in order
to insure the absolute perfection of its working parts. Up and down
these long rows of humming machines, skillful and patient mechanics are
passing, narrowly watching each machine to see if it runs smoothly and
properly. If a wheel revolves unevenly here, or a “bearing” pinches or
is too loose there, back goes the machine to have the deficiency
remedied, after which it must again pass the same ordeal. The Assembling
and Adjusting Departments are 50 feet wide, and occupy a length of 1,100
feet on two floors. The views in these rooms cannot be adequately
described, and we therefore give our readers accurate full page
representations of the same.
Next comes the Machine Inspection Department, 200 feet long and 50 feet
wide. Here the machines are again inspected by competent artisans, and
if perfect in every respect are passed over to long rows of girls, who
put them through the further test of stitching, and see that they are
capable of producing an absolutely perfect stitch. Over fifty girls are
constantly employed in this particular work.
[Illustration:
“SETTING UP” THE MACHINES.
]
The next process is what is technically known as “setting up.” The
Setting Up Department is 460 feet long and 60 feet wide, and here the
stands and tables are put together and placed in long rows; the complete
machine head is properly fastened in its place, the belts and treadle
are adjusted, and the machine stands on its table ready for duty.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account