Geography of the LandOgden, Herbert G. (Herbert Gouverneur)
History
Geography of the Land
Ogden, Herbert G. (Herbert Gouverneur)
Geography
The Panama canal project, supposed to have been abandoned in hopeless
financial ruin, has recently been revived, with new concessions
extending the period for construction, and, it is currently reported,
a scheme for a colossal lottery company for raising the means for
prosecuting the work. It seems incredible that this canal shall become
a fact in this generation; but if it is the feasible route its
projectors claim, it is not improbable that the demands of a future
generation may necessitate its construction.
* * * * *
A year ago I commented upon the improvement of the Mississippi river.
Since then one of the greatest floods on record has visited the lower
river country, devastating a large area. It brought to the settlers in
the valley, however, a new experience, and has inspired them with a
confidence in the levée system that finds expression in the demand for
levées of approved construction from Cairo to the Gulf. The flood of a
year ago covered many square miles. A large proportion of the area,
{38} however, was not protected by levées, and another large
proportion was only partially protected; and while, therefore, the
disaster impressed the general public with a belief that the levées
were a failure, the facts really point to the contrary. In former
notable floods it has not been unusual for one hundred or more miles
of levée to be washed away before the flood subsided, but on the
recent occasion there was a total length of less than five miles
destroyed in some 1,100 miles of levée that had been believed to be
safe. This is a remarkable showing, and has naturally inspired the
advocates of the system with greater confidence. It points to the
possibility of constructing levées at a reasonable expense that will
stand the pressure of water for the height that it has been computed
necessary to build them. There is a grave doubt, however, in the minds
of some as to whether the computed heights, the levées holding intact,
will afford sufficient cross-section to carry off the volume of water
draining from the catchment basins. Some interesting computations on
this subject have recently been made by General Greely, the chief
signal officer,[1] from observations made during an extended period.
[Footnote 1: North American Review, May, 1890.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account