Geology -- Georgia -- Stone Mountain; Stone Mountain (Ga.); Stone Mountain Memorial (Ga.)
[Illustration: Augustus Lukeman inspecting work on Lee’s face. Note
white model at left.]
Starting April 1, 1925, Lukeman knew he could never complete the
memorial before the 12-year contract would expire in 1928. His hope was
to get enough done to show that he could and would finish it. So he
worked at top speed. Lukeman made a new design in classic style showing
President Jefferson Davis, General Robert E. Lee and Lieutenant General
Stonewall Jackson on horseback as the central figures, followed by an
army apparently marching out of the solid rock. His master model was on
a scale of 12-to-1—one inch on the model corresponded to a foot on the
mountain.
Lukeman had the curving face of the mountain blasted off to a vertical
wall 305 feet wide by 190 feet high. Although the steep area looks
almost straight up, the bottom of the cut made a shelf extending outward
42 feet.
To get his men up against the wall where they could work, Lukeman had
twenty-one 10-inch steel beams placed along the top of the cut, so they
extended 30 feet out into space. Workmen’s scaffolds were suspended from
these by steel cables, with winches to raise and lower them. A dozen men
usually were on the job, although 42 crowded the scaffolds during one
rush period. Only eight were carvers, the rest helpers.
The sketch of Lukeman’s model was painted onto the mountain by
painstakingly measuring all the component points, so there could be no
distortions in the figures.
[Illustration: Four men directing a pneumatic drill.]
[Illustration: Lukeman’s original master model.]
Cutting into Stone Mountain had to be done mechanically since explosives
can start a crack in granite that may run on for many feet. If an area
four feet high by two feet wide needed to be gouged out two feet deep a
jackhammer crew would drill a row of holes almost touching each other
down the sides and across the bottom, then a row slanting downward
across the top. Wedges were hammered into the slanting holes until the
block broke loose and plummeted earthward.
A drill was good for only a few minutes in the hard granite before its
point was dulled, and a fresh one had to be inserted. The dull drills
were sent by cable and pulley down to the shop on the ground just out of
range of falling rock, where two blacksmiths were kept busy sharpening
and repairing tools.
Whereas one man can hold a pneumatic drill straight up and down to break
up the paving in a street, it took four men per hammer to drill
horizontal holes into the face of the mountain. One guided the drill and
held it in place. Two helped lift the heavy hammer. The operator did his
share of lifting and worked the trigger. All exerted what force they
could to press the drill into the mountain.
After a figure was blocked out in this manner, skilled carvers with hand
and air-powered tools completed the job.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account