Glen Canyon DamUnited States. Bureau of Reclamation
Science
Glen Canyon Dam
United States. Bureau of Reclamation
Glen Canyon Dam (Ariz.)
The Federal Government will finance the project, but the people who use
the water and power will repay about 99 percent of the cost—about
two-thirds with interest.
BRIDGE AT THE DAMSITE
[Illustration: Bridge]
Bridges were among the first essentials at Glen Canyon damsite. The
vertical walls of the Canyon rise about 700 feet above the river. The
distance from rim to rim is only 1,200 feet in a straight line, but it
is about 190 miles by road.
The Glen Canyon Bridge, a spectacular rim-to-rim highway, spans the
canyon immediately downstream from the dam. It is the highest and
second-longest steel arch bridge in the United States; its 1,028 foot
arch stands 700 feet above the river. The deck is 1,271 feet long. The
roadway is 30 feet wide and is paralleled by 4-foot sidewalks. The
bridge was dedicated and opened to public use on February 20, 1959.
Materials and equipment are transported to the canyon floor by
highlines—heavy cableways stretched between towers, two on each rim.
Loads of 50 tons are lowered from them on pendant hooks.
CONSTRUCTION
[Illustration: Construction in progress]
Glen Canyon Dam, like all large Reclamation dams, is being built by
private construction companies that are awarded contracts by competitive
bidding. The prime contract, totaling $107,955,122, was awarded to the
Merritt-Chapman and Scott Corporation of New York City, April 29, 1957.
It provides for construction of the dam and powerhouse and is the
largest single contract the Bureau has ever awarded and probably the
largest for any type of construction project.
By June 1960, the contractor had completed the diversion and spillway
tunnels, lined them with concrete, built the coffer dams (temporary
earth structures diverting the river around the damsite during
construction), and excavated the foundation of the dam. First placement
of concrete in the foundation of the dam and powerhouse was observed by
public ceremonies at the damsite on June 17, 1960. Initial storage of
water behind the dam is scheduled for early 1962.
A $6,392,000 contract for the manufacture of eight 155,500-horsepower,
150-r.p.m., vertical-shaft hydraulic turbines for the powerplant has
been awarded to the Baldwin-Lima Hamilton Corp. Additional contracts for
generators and other adjuncts will be awarded later to equip the dam and
powerplant. Glen Canyon’s first hydroelectric generating unit is
scheduled to go on line in 1964.
RECREATION PLANS
[Illustration: Water recreation]
The Glen Canyon of the Colorado River is an unusually placid, 162-mile
reach from Hite, Utah, to Lees Ferry, Arizona. Major John Wesley Powell,
who headed the first expedition down the river in 1869, named it Glen
Canyon because of the occasional oak glens along its banks and at its
junctions with tributaries.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account