penstock pipes which will carry water from the reservoir
through the dam and into the turbines in the powerplant.
GENERAL
Q. What are the numerous black spots above the tunnel portals and
elsewhere?
A. These are 8-inch square metal plates on the ends of anchor bolts.
The anchor bolts extend into the rock to support the relatively
thin outer layers of rock.
Q. What are the white markings on the canyon walls?
A. Survey control or reference points which have been painted on the
rock.
Q. Why was the small suspension footbridge built?
A. More than 2 years was required to build the Glen Canyon Bridge—the
highest steel-arch bridge in the world. Therefore, the
footbridge was built so workers could cross the 1200-foot wide
canyon; otherwise, it was 200 miles around by road.
CONCRETE PLACEMENT
GENERAL
Q. How much concrete will the dam contain?
A. There will be more than 5,000,000 cubic yards of mass concrete in
the dam, and about 400,000 additional cubic yards in the
powerhouse, tunnels, and other structures at the damsite.
AGGREGATE (Sand and gravel for the concrete)
Q. Where does the aggregate used to make concrete come from?
A. From the streambed of Wahweap Creek, 6 miles from the damsite.
Q. Is there a conveyor belt from the aggregate plant to the damsite?
A. No. The aggregate is hauled in large bottom-dump trucks.
CEMENT
Q. How much cement will be needed?
A. Approximately 3 million barrels, or 12,000,000 sacks.
Q. Where does the cement come from?
A. From a new cement plant constructed by the American Cement
Corporation near Clarkdale, Arizona, 188 miles south of the
damsite.
POZZOLAN
Q. What is pozzolan?
A. Pozzolan is a cement-like material which occurs in natural
deposits.
Q. Why is pozzolan used?
A. Pozzolan is cheaper than cement; it reduces shrinkage in concrete
and develops less heat in concrete during the curing period.
Q. Where is it obtained?
A. Near Flagstaff, Arizona, about 115 miles from the damsite. About
220,000 tons will be used along with 564,000 tons (3,000,000
barrels) of cement.
CONCRETE MIXING PLANT
Q. What is capacity of the mixing plant?
A. The maximum capacity is 480 cubic yards per hour, which is mixed
in six, 4-cubic yard concrete mixers.
Q. How large is the mixing plant?
A. It is 217 feet, or more than 20 stories, in height.
HIGHLINE CABLEWAYS
Q. What will the highlines do?
A. Their main function is to carry the buckets of concrete from the
batch plant to points of placement in the dam and powerplant.
Q. What is the size and weight of the concrete buckets?
A. 12 cubic yards. When filled, the buckets weigh 31 tons, 24 tons of
which is the concrete carried in the buckets.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account