Building -- Estimates; Factories -- Design and construction; Hardware
COST OF MISCELLANEOUS ITEMS OF CARPENTRY
===================================+=======+=======================
Class of Work | Cost | Remarks
-----------------------------------+-------+-----------------------
Setting window frames in |$ .45 |Each.
wooden buildings | |
| |Per square foot;
Furring brick walls, 1" × 2" | .02½ | includes labor,
strips, 12-inch centers | | material, and nails.
| |
Furring brick walls, 1" × 2" | .01⅞ |Per square foot.
strips, 16-inch centers | |
| |
Cutting holes and fitting | .05 |Each.
plugs in brick walls | |
| |
Setting window frames in brickwork| .60 |Each; includes nails
| | and bracing.
| |
Setting door frames in brickwork | .60 |Each.
| |
Setting window frames in stonework | 1.25 |Each, for ordinary work.
| |
Setting window frames in stonework | 2.00 |Each, for very careful
| | work.
| |
Setting door frames in stonework | 2.00 |Each, for very careful
| | work.
| |
Furnishing and setting trimmer-arch| 2.00 |Each
centers | |
| |
Arch centers, 4-foot span, | 1.50 |Each; includes supports
8-inch reveal | | and wedges.
===================================+=======+=======================
=54. Nails.=—To calculate the quantity of nails required in executing
any portion of the work, Table IX, which is based on the use of cut
nails, will be found useful.
TABLE IX
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account