Building -- Estimates; Factories -- Design and construction; Hardware
=60. Planning the Boiler Room.=—In locating the boilers in the boiler
room, which should be done in the plans of the building, for it is not
customary to cement the floor space covered by the boilers, and the
cost of the building is thus reduced, a passageway not under 3 feet,
and better 4 feet, should be left back of the boilers. This passageway
is required in order to have access to the clean-out doors and the
blow-off cocks. The ordinary horizontal return-tubular boiler, and
some water-tube boilers, can be constructed in a battery, with as many
boilers as may be desired in a row, especially when the passageway
is left back of the boilers. When setting other types of water-tube
boilers, space should be left between each battery of two, for in
these boilers, cast-iron doors are provided in the side walls for
blowing the soot from the tubes, and access must be had through the
side walls of the boiler for this purpose. It is therefore necessary in
laying out the boiler space for boilers of this character to provide
a passageway on one side of each boiler. In Fig. 29, a battery of
return-tubular boilers is indicated, showing the clean-out doors for
taking away the accumulation of soot and ashes that might be back of
the bridge wall, through a passageway at the rear of the boilers. Some
water-tube boilers are set in batteries of two, as the Babcock & Wilcox
water-tube, land-type boiler, which is provided with the necessary
clean-out doors, and doors for blowing the soot off the tubes in the
side wall.
[Illustration: _Front of Boilers_ FIG. 29]
It is therefore necessary in laying out the boiler room of a
manufacturing plant to consider carefully the character of the steam
generator and study its requirements, so that it may be successfully
operated and the proper spaces allotted.
[Illustration: FIG. 30]
=61. Doorway to Engine and Boiler Room.=—In the hasty design of
buildings, it is frequently found that the size of the doorways is not
sufficient to admit the boilers and machinery. This is a serious defect
in the planning of a manufacturing plant, as it requires either the
installation of the boilers and engines before the walls are entirely
built, or else the tearing out of brickwork and jambs in order to
accommodate them afterwards. An expedient for the enlargement of the
headroom of doorways and openings into the boiler and engine rooms that
are in the basement, is shown in Fig. 30. Here, if the lintel of the
doorway _a_ is kept below the floor level, where it would ordinarily
exist, the headroom of the doorway will be materially reduced, and
considerable difficulty will be encountered in taking any large piece
of machinery, or a boiler or steam drum, down the steps _b_. The
doorway is consequently increased in height by the introduction of the
bulkhead at _c_; while by this means the floor space above is slightly
reduced, yet use can frequently be found for the ledge or platform
frame at the top of the bulkhead, as at _d_.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account