nails, Table of sizes of, §55, p6 stone, §61, p6 stone, Cost of ashlar and, §60, p26 D Designs of hardware, Stock and commercial, §55, p22 Dimension stone, §60, p24 Dimensions of factory chimneys, §64, p45 Ditch work, Estimating the cost of, §60, p15 Door bolts, §55, p108 chains, §55, p107 checks, §55, p111 frames and doors, Cost of, §60, p65 frames, Attic, §61, p24 frames, First-floor, §61, p24 frames, Second-floor, §61, p24 hangers, §55, p114 holders, §55, p105 knobs, §55, p70 knobs, Brass and bronze, §55, p72 knobs, Cast-iron, §55, p71 knobs, Sizes and styles of, §55, p73 knobs, Spun-metal, §55, p73 knobs, Stamped, §55, p72 knobs, Wooden, §55, p71 knockers, §55, p121 Korelock, §60, p66 locks, Interior, §55, p50 pulls, §55, p102 -screen latches, §55, p124 springs, §55, p111 stops, §55, p105 trims for water closets, §55, p123 Doors, Attic, §61, p26 Cost of door frames and, §60, p65 Elevator, in factories, §64, p8 Fireproof, §64, p57 First-floor, §61, p25 Second-floor, §61, p26 Double-acting hinges, §55, p33 -door locks, §55, p57 Dowel-pin, Barbed, §55, p10 Drainage system, §61, p39 Drainage system, Estimates for, §60, p70 Drawer pulls, §55, p135 Drive screws, §55, p13 E Elbow catches, §55, p134 Electric wiring, Cost of, §61, p41 Elevator doors in factories, §64, p8 Freight, in factories, §64, p8 latches, §55, p124 Location of, in factories, §64, p8 -shaft windows, §64, p10 shafts in factories, §64, p8 Escutcheons, §55, p136 Espagnolette bolts, §55, p96 Estimate, Important factors of, §60, p2 Estimates and cost of gas-fitting, §60, p72 for drainage system, §60, p70 for water-supply system, §60, p71 of well supply of water, §60, p71 on plumbing fixtures, §60, p72 Estimating and calculating quantities for gas-fitting, §61, p40 and calculating quantities for heating and ventilating system, §61, p35 and calculating quantities for painting, §61, p42 and calculating quantities for plumbing system, §61, p37 and calculating quantities, Scope of subject of, §61, p1 Approximate, §60, p3 brickwork, §60, p6, p33 carpentry, §60, p6 concrete work, §60, p5 cost of ashlar or cut stone, §60, p28 cost of ditch work, §60, p15 Example in, §61, p1 Glazing, §60, p11 Heating and ventilating system, §60, p8 Joinery, §60, p7 of hardware, §55, pl48; §60, p8 of matched flooring, §60, p40 on excavation, §60, p5, p11 on glazing, §60, p78 on papering, §60, p77 Outline of the work of, §60, p4 Painting and papering, §60, p10 Plastering, §60, p7 Plumbing and gas-fitting, §60, p9
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account