Principles of, §60, p3 roofing, §60, p7 schedule, Accurate, §60, p5 schedule, Items of, §60, p5 sheet-metal roofs, §60, p51 Estimating shingles, Table of data for, §60, p48 stone work, §60, p5 stucco work, §60, p58 Estimator, Qualifications of, §60, p2 Excavation, Actual cost of, §60, p12 Calculating the volume of an, §60, p16 Cellar, §61, p2 Contractor’s method of figuring, §60, p14 Estimating on, §60, p11 for wall footings, §61, p3 Excavations, Calculating quantities for, §61, p2 Cost of, §61, p4 Miscellaneous, §61, p3 Expansion bolts, §55, p14 Exterior joinery, Miscellaneous, §61, p32 painting work, §61, p42 F Factories, Ash disposal in, §64, p42 Automatic sprinklers in, §64, p53 Boiler room in, §64, p41 Boiler-room planning in, §64, p42 Coal storage in, §64, p42 Fire-protection in, §64, p50 Floors above boilers in, §64, p45 Power plant in, §64, p41 Sprinkler tanks in, §64, p50 Sprinkling system in, §64, p50 Factory buildings, Concrete, §64, p23 chimneys, Dimensions of, §64, p45 elevators, Location of, §64, p8 planning, §64, p3 Fence nails, §55, p10 Figured rolled glass, §55, p159 Filing, §61, p4 Finishes, Hardware, §55, p23 Finishing hardware, §55, p20 nails, §55, p8 Fire-doors, §64, p57 -protection in factory and mill buildings, §64, p50 -tower, Location of, §64, p8 -tower stairway, §64, p4 -towers, Number of, §64, p7 Fittings, Pipe and, §61, p41 Fixtures, Estimates on plumbing, §60, p72 Gas, §61, p40 Plumbing, §61, p37 Flagstones and curbing, Cost of, §60, p26 Fireproof windows, §64, p54 Floor arches, Cost of terra-cotta, §60, p35 Concrete footings and, §61, p7 construction, §64, p14 construction, Slow-burning, §64, p18 Floor framing, Attic, §61, p13 framing, Back-porch, §61, p14 framing, First-story, §61, p11 framing, Front-porch, §61, p13 framing, Second-story, §61, p12 glass, §55, p160 hinges, §55, p35 slabs, Table of cost of reinforced-concrete, §60, p22 Flooring, §61, p19 Calculating sheathing or rough, §60, p40 Cost of, §61, p19 Estimating matched, §60, p40 Rift-sawed, yellow-pine-finish, §61, p19 Yellow-pine porch, §61, p19 Floors, Cost of cement cellar, §60, p23 Table of labor cost of laying wooden, §60, p44 Flush bolts, §55, p111 Footings, §64, p14 and floor, Concrete, §61, p7 Cost of concrete, §61, p7 Excavation for wall, §61, p3 for factory columns, §64, p28 Foundation piers in factories, §64, p16 walls in factories, §64, p16 Frames and doors, Cost of door, §60, p65 and windows, Cost of window, §60, p63 Attic door, §61, p24 Attic window, §61, p28 Cellar window, §61, p26
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account