Building -- Estimates; Factories -- Design and construction; Hardware
=120.= Formerly, builders’ hardware could only be obtained in a
few styles, and there was not much choice regarding its physical
construction and mechanical operation, so that its selection could be
left to the contractor or builder. Specification, therefore, usually
included little more than a mere statement that the necessary hardware
should be furnished and that it should be of good quality.
In recent years, however, the revolution accomplished in the designing
and making of builders’ hardware has elevated it to an important
place in decorative art, and, simultaneously, the creating of new and
higher mechanical grades has radically changed the requirements in
specifications relating to this subject.
=121.= A few standard forms of hardware specifications that should
secure good results will now be considered. For convenience of
reference, these several forms are marked I, II, and III. The first two
forms are probably as good general forms of hardware specifications as
can be written, but, while they answer the purpose in some instances,
they should not be used where it is intended to have the general
contract include all the hardware, or where it is possible to prepare
an itemized specification such as that given in Form III. The numbering
of the paragraphs in these forms is continuous with this Section, but
in practice they generally start with 1.
FORM I
(SEE GENERAL CONDITIONS)
=NOTE.=—Under the head of _General Conditions_ preceding all
specifications furnished to contractors by the architect, a series of
binding requirements, reservations, and stipulations are specifically
stated, and it is most essential that the contractor carefully peruse
them, as he is bound by them as well as by the clauses under the
heading of Hardware Specifications.
=122. Rough Hardware.=—Provide all the rough hardware, such as nails,
screws, sash weights, pulleys, chain or cord, anchors, screw bolts, and
all other material in this line necessary for the completion of the
operation.
=123. Finishing, or Builders’, Hardware.=—All fastenings and metal
trimmings used on doors, windows, transoms, closets, cabinets,
pantries, etc. will be furnished by the owner and delivered at the
building in the quantities and at the times reasonably needed by
the contractor, he to apply the same under the direction and to the
satisfaction of the architect.
The contractor is to be responsible for all hardware after delivery and
until the completion of the building. He shall hang all doors, properly
fit all locks, etc., and return them to their original packages until
after completion of the painting or finishing, when he shall place them
permanently. All knobs shall be covered with Canton flannel, to protect
them from injury, and all keys are to be cared for until the building
is delivered to the owner. The contractor shall place all keys in their
locks or deliver them to the architect with tags attached, indicating
where they belong.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account