4. When the conditions are the same as those just given, except that
the excavation is from 6 to 10 feet deep, the price is about 45 cents
per cubic yard.
The prices just given do not include hauling, except short hauls
immediately in the vicinity of the operations. The cost of hauling will
depend on the distance to the place where the material is to be dumped.
=12.= To obtain the cost of any of the classes of excavation just
given, including hauling, divide the hire of the team per day by the
number of cubic yards that can be removed to the dumping place per day,
and increase the preceding prices by that amount.
To figure the cost of sheet piling, measure the area to be sheet-piled
and allow for such stringers and braces as judgment may suggest. Since
the lumber may be used for other purposes after serving as piling,
its value should be estimated at 75 per cent. of the market price. It
usually costs about $7 per thousand feet to put the piling in place. As
a rule, 3" × 10" planks are used for this purpose.
The foregoing prices cover the general run of building work. For large
office buildings and other structures of a similar nature, where it is
necessary to excavate to a depth of about 25 feet and where several
varieties of ground are likely to be encountered, an average price for
digging (exclusive of pumping or shoring, but including a haul not
exceeding 1 mile) is $1.25 per cubic yard. If large boulders are likely
to be encountered in excavating, the price should be at least $1.50 per
cubic yard.
DITCH WORK
=13.= In estimating the cost of =ditch work=, there are several factors
that influence the price. A narrow ditch costs more to dig per cubic
yard than a wide one; likewise, a deep ditch costs more than a shallow
one. Following are given prices for laying agricultural drain tiling.
While these figures do not include builder’s profit, they are based
on the actual cost of work, the wages for a day of 8 hours being $2
for laborers, $2.50 for the foreman, and $4 for a horse and driver.
In sections of the country where higher wages are paid, it will be
necessary to increase the figures at a proportional rate when making
estimates.
For trenches 3 feet deep and 18 inches wide, in very hard, clay soil
with about 10 inches of loam on top, the cost of excavating is about
12 cents per linear foot, or 72 cents per cubic yard. For filling in
the trench with the aid of a team and a scraper, it costs ¾ cent per
linear foot. For laying a 4-inch tile, including distributing along the
trench, the cost is ¾ cent per linear foot. For picking stones off of
the ground and placing them over the pipe to a depth of about 8 inches,
it costs 2¼ cents per linear foot. Each outlet built of field stones
laid in cement costs from $5 to $8.
CALCULATING THE VOLUME OF AN EXCAVATION
[Illustration: FIG. 1]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account