Hidden Treasure: The Story of a Chore Boy Who Made the Old Farm PaySimpson, John Thomas
Science
Hidden Treasure: The Story of a Chore Boy Who Made the Old Farm Pay
Simpson, John Thomas
Farm life
They took down their lines, wound them up carefully and laid them
aside for further use. Bob decided, in order to keep the frost from
getting under the walls, they'd have to place the footings three feet
below the finished grade. In order to throw the water away from the
buildings, it would also be necessary to make a fall of six inches on
the high corner. This would make the trench for the footings two feet,
six inches deep at that point, and as there was a drop of eight inches
to the southeast corner, the trench there would be one foot, ten
inches deep. Between the grade stakes they now dug out a section the
full width of the footings and about three feet long, and located the
exact bottom of the trench by measuring down three feet from the under
side of the level board as it rested on two of the grade stakes.
They threw the excavated earth inside of the building to bring the
floor up to grade, and when the depth holes were completed they dug
out the sections between them, leveling the intervening space by their
eyes.
Bob was so interested in the new building that he and Tony went back
and worked until dark, so as to have the excavation ready for footings
in the morning.
"I'm going to scold you for breaking the Union rules, Bob," laughed
his aunt, when he came into the sitting room a few minutes after eight
o'clock. "You know we decided not to work after six o'clock."
"Yes, I know we did, Aunt Bettie," said Bob, "but I was so anxious to
get the excavation done, ready for concreting to-morrow."
"Well, I suppose if I could command the sun to stand still, like
Joshua of old, you wouldn't be willing to stop until the whole job was
done," she laughed. "How long do you think we could remain happy here
if we all began working from daylight until dark? Life would soon
become a burden, and you'd be the first one to leave for the city,
Bob. Besides, if we keep long working hours, we'll miss our pleasant
evenings together, and I'm not willing to give them up," she smiled at
him across the table. "I guess you're right, Aunt Bettie," he replied,
as he sat down in a chair, too tired to read. "I won't do it again."
The next morning Bob had his chores and milking done by six o'clock
and by six-thirty he was out at the new hen house, where he was joined
by Tony.
"Good-a morn, Mr. Bob," smiled Tony. "This-a the day we make-a da
concrete fast."
"That's what we will," replied Bob. "Get some cement, Tony, and we'll
start the mixer going right away."
While Tony was getting the cement, Bob filled his six cubic foot
measure with sand and gravel, and on top of these he placed one bag of
cement, then he started the engine and the elevator emptied the load
into the drum, which, as soon as he added the water, he set revolving.
When the concrete was thoroughly mixed, he threw the dumping lever
over and filled the wheelbarrow that Tony placed under the discharging
end of the drum.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account