History for ready reference, Volume 2, El Dorado to GreavesLarned, J. N. (Josephus Nelson)
History
History for ready reference, Volume 2, El Dorado to Greaves
Larned, J. N. (Josephus Nelson)
History -- Dictionaries
"Cyrus Field ... established a company in America (in 1854),
which ... obtained the right of landing cables in Newfoundland
for fifty years. Soundings were made in 1856 between Ireland
and Newfoundland, showing a maximum depth of 4,400 metres.
Having succeeded after several attempts in laying a cable
between Nova Scotia and Newfoundland, Field founded the
Atlantic Telegraph Company in England. ... The length of the
... cable [used] was 4,000 kilometres, and was carried by the
two ships Agamemnon and Niagara. The distance between the two
stations on the coasts was 2,640 kilometres. The laying of the
cable commenced on the 7th of August, 1857, at Valentia
(Ireland); on the third day the cable broke at a depth of
3,660 metres, and the expedition had to return. A second
expedition was sent in 1858; the two ships met each other
half-way, the ends of the cable were joined, and the lowering
of it commenced in both directions; 149 kilometres were thus
lowered, when a fault in the cable was discovered. It had,
therefore, to be brought on board again, and was broken during
the process. After it had been repaired, and when 476
kilometres had been already laid, another fault was
discovered, which caused another breakage; this time it was
impossible to repair it, and the expedition was again
unsuccessful, and had to return. In spite of the repeated
failures, two ships were again sent out in the same year, and
this time one end of the cable was landed in Ireland, and the
other at Newfoundland. The length of the sunk cable was 3,745
kilometres. Field's first telegram was sent on the 7th of
August, from America to Ireland. The insulation of the cable,
however, became more defective every day, and failed
altogether on the 1st of September. From the experience
obtained, it was concluded that it was possible to lay a
trans-Atlantic cable, and the company, after consulting a
number of professional men, again set to work. ... The Great
Eastern was employed in laying this cable. This ship, which is
211 metres long, 25 metres broad, and 16 metres in height,
carried a crew of 500 men, of which 120 were electricians and
engineers, 179 mechanics and stokers, and 115 sailors. The
management of all affairs relating to the laying of the cable
was entrusted to Canning. The coast cable was laid on the 21st
of July, and the end of it was connected with the Atlantic
cable on the 23rd. After 1,326 kilometres had been laid, a
fault was discovered, an iron wire was found stuck right
across the cable, and Canning considered the mischief to have
been done with a malevolent purpose. On the 2nd of August,
2,196 kilometres of cable were sunk, when another fault was
discovered. While the cable was being repaired it broke, and
attempts to recover it at the time were all unsuccessful; in
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account