History of the Confederate Powder Works
Rains, George Washington
Confederate Powder Works; Speeches, addresses, etc.; United States -- History -- Civil War, 1861-1865
During the many hours spent in railroad cars, these matters were thought
over and planned separately as necessity required. A rough sketch was
made, dimensions given, and location designated; this data was placed in
the hands of capable men to carry out. In my young Architect and Civil
Engineer, C. Shaler Smith, recommended by the proprietors of the
Richmond Tredegar Iron Works, I at once recognised genius of a high
order, and placed in his hands my rough sketches of buildings to
elaborate and give architectural finish. All know with what result, the
fine taste exhibited in the massive and beautiful structures which
ornamented the banks of the Augusta Canal, for two miles, bore witness
of his success.
Good fortune also brought to my notice, by a casual encounter with
General Pendleton, Chief of Artillery at Richmond, a skilled machinist,
who had served his time at the Tredegar Works, and was then a Sergeant
in the Confederate army. He, William Pendleton, was applied for, and in
his acquisition, was gained a man of capability and integrity, into
whose hands could be confidently placed the erection of all the
extensive machinery then in process of construction. The responsible
duties of Superintendent of the Works were also committed to his charge.
The Tredegar Iron and Machine Works, at Richmond, were the only ones
throughout the South, having adequate capabilities for the construction
of the heavy and extensive machinery required in the projected
Confederate Powder Works. They were only partially available for the
purpose, however, as the demands made upon them for heavy artillery, and
for all kinds of urgent work required by the Government, absorbed their
resources, nevertheless, I was compelled to call upon them for most of
the twelve circular iron beds, and twenty-four ponderous five ton iron
rollers, with other work required for the incorporating Mills, which,
together, weighed 240 tons; two of the rollers were made in Macon and
two in Chattanooga.
The immense iron shaft, nearly three hundred feet long, varying from
twelve inches in diameter at the central portions, to ten inches and
eight inches, toward the extremities, was cast and completed in
sections, mainly, at the Webster Foundry and Machine Works at the latter
city; here, also, were made the twelve heavy spur wheels, and twelve
powerful friction arrangements to start and stop gradually each set of
rollers separately, as the main shaft, working in the extensive
subterranean archway, which extended below the line of mills, continued
its incessant revolutions.
The great gear-wheel, sixteen feet in diameter, attached to the centre
of this shaft, giving it motion, with its corresponding massive pinion
on the engine shaft, were cast and accurately finished at Atlanta.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account