Among the chief services rendered by the companies it is recorded,
that a party levelled and cleared the channel of the river between
Black Rapids and the head of Long Island. Over the canal they built
a bridge connecting upper and lower Bytown, which still bears the
designation of the “Sappers' bridge.” In the construction of the
first eight locks at the Ottawa, the companies participated to an
important extent, and Sir Henry Hardinge, in his evidence before the
Select Committee in March, 1828, alluded to their employment at some
of the most difficult parts of the work towards the Ottawa.[276] No
less difficult was the work executed by them at Hog’s bank. The dam
there had been commenced by the contractor, but he ultimately
abandoned the undertaking. Sixty men of the corps were withdrawn
from the Ottawa to recommence it, and, with some hundred labourers,
were employed at the dam all the winter of 1828 and 1829. Before the
breaking up of the frost, the masonry was nearly completed with a
base of 25 feet; but on the 6th April, 1829, the water found its way
through the frozen earth, and making a breach in the dam, carried
away everything opposed to it. This was the second failure. Still a
third time it was attempted, and under the superintendence of
Captain Victor of the royal engineers, a strong framework of timber
was formed in front of the breach, supported and strengthened by
enormous masses of clay, stone, and gravel, with a base of 250 feet,
which successfully overcame the difficulty; and the dam, in 1837,
was the most substantial work on the whole line of canal.[277]
-----
Footnote 276:
‘Select Report Ordnance Est.,’ printed 12th June, 1828, p. 82.
Footnote 277:
‘Prof. Papers, Royal Engineers,’ i. p. 86.
-----
------------------------------------------------------------------------
[Illustration:
Royal Sappers & Miners Plate XIV.
UNIFORM 1832 Printed by M & N Hanhart.
]
------------------------------------------------------------------------
On the completion of the work, which cost upwards of a million of
money, the two companies were disbanded in December. Their united
strength on leaving England was 160, and the casualties during their
period of service at the canal were as follows:—
Deserted 35 Of whom two were apprehended and
transported.
Transported 1
Died 16
Killed 5 By blasting rock, either in the
quarries or the canal.
Drowned 1
71 Thirty-seven at the Isthmus of Rideau
Discharged Lake, and thirty-four at
Bytown.[278]
Invalids, and remnant of }
companies returned to } 31
England } ___
Total 160
-----
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account