History of the Royal Sappers and Miners, Volume 2 (of 2): From the Formation of the Corps in March 1712 to the date when its designation was changed to that of Royal EngineersConnolly, T. W. J. (Thomas William John)
History
History of the Royal Sappers and Miners, Volume 2 (of 2): From the Formation of the Corps in March 1712 to the date when its designation was changed to that of Royal Engineers
Connolly, T. W. J. (Thomas William John)
Great Britain. Army. Royal Sappers and Miners
The company disembarked at Varna on the 27th, and the scene at the quay
was strikingly interesting and animated. About 250 French sappers had
also landed from the ‘Cacique,’ and working as they did some twenty
yards from the British sappers, a good opportunity was afforded for
contrasting the temperament and military habits of the two nations. The
French, gay, volatile, and impulsive, stirred about with elated spirits
and elastic activity, that gave a cheerful, though an impetuous aspect
to their exertions; whilst the English sappers, grave, impassible, and
taciturn, wheeled off scaling ladders and stores so devoid of bustle and
joyousness, and with so much attention to order and composure, that an
air of stern and serious necessity was impressed on their labours.
Nevertheless, the work was done with a business-like energy and
earnestness that seemed more than adequate for any task or
enterprise.[144]
Varna for a few months was the principal frontier station and depot for
engineer stores and pontoons, from whence parties were thrown out to
Devno, Aladyn, Monister, Rustchuk, &c. At Varna the companies built a
stone pier of some pretensions, and a wooden one at the south side of
the bay, run out into deep water 140 feet from the beach. They also
banked up the shore, deepened the little harbour, and improved the
almost trackless roads beyond and within the vicinity of Aladyn, making
them passable for heavy wheeled conveyances. Much of the work was
carried on in bog and water, which, however, was ultimately
discontinued, as it was found that some of the men who were so employed,
died from cholera, traceable to their exertions and exposure.
About seventy men of the tenth company marched to Devno on the 29th May,
who repaired the roads, removed the accumulations of years from deserted
fountains, rendering them again useful for thirsty wayfarers, built
ovens for baking bread, raised dams to collect water for the troops, and
constructed a bridge across the lake. From a lonely burial-ground,
filled with blocks of unhewn and unsculptured granite, marking
nevertheless the sites of numerous graves, the sappers took the largest
stones, and used them in erecting a bridge over one of the narrow
channels which joined the lakes of Aladyn and Devno. The men worked very
hard, at times up to their breasts in water. The correspondent of the
‘Times,’ in speaking of this work—June 29th—termed the sappers “a most
utilitarian corps while Captain Gordon, in a letter to a brother
officer, remarked with respect to its general services, “that the men
work well and behave well. To be with them is a pleasure.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account