The dummy ring and piston were found broken in the port H. P. astern; but
these were renewed and machined in place, the jacking engine turning the
rotor while a cutting tool was attached to the flange of the casting,
thus making a lathe out of the turbine and solving the practically
impossible problem of removing the rotor from the ship to be placed in a
lathe ashore.
It was found that the impulse stages in this turbine had been the cause
of the damage to this dummy, so it was decided to remove the impulse
stages entirely, which was done. This decreases the economy of the
turbine, but the safety guarantee to the successful operation of this
unit so far overbalanced this factor that economy was sacrificed.
The starboard H. P. astern casing had several bad cracks in both top and
bottom, and from records on board had not been in use on the last voyage
of the vessel. This was in process of being electrically welded when I
reported on board. The method in use, however, proved later on test, to
give a faulty weld, so that it was decided to cut a deep “V” groove in
the cracks and lace with steel studs, the lacing being filled in with
the weld, thus giving the weld holding power due to the welding material
fusing with the studs. This machine operated successfully during the
entire commission of the vessel with no signs of ruptures or faulty welds.
On examination of the main throttles the starboard H. P. astern throttle
spool was found to be broken and off the stem. This throttle was renewed
and operated satisfactorily.
The system of automatic control of feed pumps in the engine room by float
and pressure control was decided on as being highly dangerous, this
system was at once removed and hand control of pumps substituted.
After operating for some time it was found impossible to obtain a
vacuum that would afford economical operation for a turbine plant. The
capacities of the pumps and condensers were computed and checked up
and found adequate for the horsepower to be handled. The low pressure
system was then tested out by water pressure and every noticeable leak
stopped. This however gave us no better results, the best vacuum we could
obtain averaging around 27 inches under normal operating conditions. The
question of the wet and dry suctions of the pumps was next taken into
consideration and it was decided to blank the dry suction off from the
condenser and lead it into the wet suction of its own pump. This was
done and with the results desired. The vacuum desired can be obtained at
all times. With circulating water at forty degrees a vacuum of as high
as twenty-nine inches has been obtained. The average vacuum under all
conditions obtained since this change is about twenty-eight inches.
GLAND STEAM TURBINE SUPPLY
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account