History of the U.S.S. Leviathan, cruiser and transport forces, United States Atlantic fleet: Compiled from the ship's log and data gathered by the history committee on board the shipU.S.S. Leviathan History Committee
History
History of the U.S.S. Leviathan, cruiser and transport forces, United States Atlantic fleet: Compiled from the ship's log and data gathered by the history committee on board the ship
U.S.S. Leviathan History Committee
Leviathan (Steamship); Vaterland (Steamship); World War, 1914-1918 -- Naval operations, American
At the end of the third day I conveyed this information to the Captain
with the request that he bring pressure to bear on the Bureau of
Navigation to send our personnel, both officers and enlisted men, as
quickly as possible. The men and officers began to arrive and by August
15th the last officer of the complement had arrived. As each arrived he
was put in charge of a station and told to trace out his station, make
a thorough examination of the interior of all piping and machinery and
submit a report on repairs necessary and estimated time. Most of my time
during the day was spent below and the nights were occupied drawing up
station bills and handling the office paper work, my only assistant being
a reserve yeoman in the service of the Shipping Board. I realized that,
even at the expense of time that should be spent inspecting repair work,
I must get my organization planned and laid out as quickly as possible,
and in operation. By August 5th all station bills and organization had
been completed and blueprinted and all officers on board instructed. At
this time, on account of report of damage to machinery under repair on
German ships by aliens, I organized a secret service force below in an
effort to detect any attempts made to inflict damage. I purposely let the
report spread around among the civilian workmen that there was a large
force of government agents employed among them and also in the crew.
This seemed to have the desired moral effect, because during the entire
period there was but one case of attempted malicious damage, which was
discovered immediately. An attempt had been made to thrust welding wire
into both of the L. P. astern turbines through the gauge line holes in
the flanges and thus damage the blading.
I will not go into details as to the condition of the machinery, but
will indicate some of the work done and the changes made in order to get
her ready for sea in the quickest possible time. Most of the changes in
design and arrangement were made before her dock trial.
Each piece of machinery and boiler was opened up in all its parts and
thoroughly examined for foreign material or damage. While open necessary
repairs were made.
The joint on every auxiliary steam and exhaust line at the piece of
machinery was broken and steam blown through before attempting to operate
the machine: this to free the line of foreign material.
All main, spring and thrust bearings were opened up, examined, cleaned
and realigned.
The float of the main thrusts were changed from .006 to .015 inches to
conform to U. S. Naval practice.
The rotors and casings of the four astern turbines were all partially
rebladed in place in the ship.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account