Illustrations of the Croton AqueductTower, F. B. (Fayette Bartholomew)
History
Illustrations of the Croton Aqueduct
Tower, F. B. (Fayette Bartholomew)
Croton Aqueduct (N.Y.)
Ventilators were constructed along the course of the Aqueduct 2 feet
square, and rising above the ground 2 or 3 feet. The Aqueduct when it
was above the ground, was supported upon a wall of masonry, and the
side walls of the channel-way had an increased thickness. When it was
elevated 6 or 7 feet above the ground, the foundation wall was six
feet thick; but when it had a greater elevation it was supported upon
arches and piers, and upon the elevation depended the span of the arch,
the thickness and height of the piers. The general declivity in the
channel-way, was 1 foot in 640, or about 8¼ feet per mile.
This Aqueduct supplied about 1,200,000 gallons of water in 24 hours.
The velocity of the water was about five times that of the water in the
Aqueducts of Rome.
This work was constructed at an immense expense, and in substituting
the “_inverted syphon_,” for high structures across valleys, there is
evidence of the intelligence and skill of those who had charge of the
construction.
A fragment of a pipe forming part of this reversed syphon, is
still preserved in the museum at Lyons, and an instance of the
Romans having laid pipes across the beds of rivers, is given by M.
Gautier, Architect, Engineer, &c., in his work called “_Traité de la
Construction des Chemins_,” published in 1778.
About 70 or 80 years ago, he was directed by Mr. Pontchartrain,
Minister of State, to repair to Rochefort, to conduct spring water to
the port from the fountains of the city, which were supplied from a
source, though quite insufficient for the city, in the neighborhood. In
his researches he discovered a good and copious source, at less than
half a league, but on the other side of the river, the Charente. Many
difficulties were presented, because at low water vessels might ground
upon the pipes and injure them.
However, Mr. Gautier proposed to lay down two leaden pipes, to preserve
a supply in case of accident to one, and to protect them by wooden
frames in an effectual way against injury, should vessels lay upon the
defence frames during low water. Mr. Begon, intendant of the Marine,
approved the plan, but it was finally rejected.
“Some years after,” says Mr. Gautier, “when I had charge of the roads
on the Rhone, and of many other works in the Province of Languedoc, and
while at Arles, I heard that a vessel had cast anchor in the Rhone,
opposite the city, to take some loading; but when the commander wanted
to sail again he could not raise the anchor. This fact attracted much
attention, and many people went to witness the singular circumstance.
The Captain, unwilling to lose his anchor, sent down a man, to find
what was the matter. The diver reported that the anchor was hooked
under something round, but he could not tell what it was. A capstan was
applied to raise it, which succeeded.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account