Great Britain. Army -- Infantry -- Drill and tactics
_Instruction of Troops._--Troops should be practised in the use of the
pick and shovel, until they can excavate without difficulty the tasks
mentioned below. Men unaccustomed to digging should, if possible, be
trained at first in sand or very light soil, until they are accustomed
to handling the shovel. When the troops practise entrenching, the
task set them should require not less than four hours’ actual work,
according to the nature of the soil (_M.M.E._, Section IV).
It will be well to arrange for a portion of the working party with a
cart to draw the tools and convey them to the site of the trenches, so
that no time may be lost in beginning work.
_Tools._--1. Each man will usually require a pick and a shovel, but it
may sometimes be desirable to allot two men to each task, in which case
the front rank man will carry the pick and the rear rank man the shovel.
2. The tools will, as a rule, be placed in heaps on the ground, picks
in one heap, shovels in another. The working party, with arms slung,
will pass between the heaps in single file, each man taking a pick in
his left hand and a shovel in his right as he passes the heaps. Tools
should be carried at the trail, point of the pick down, and the hollow
of the shovel towards the thigh.
3. It is important that soldiers should be taught to handle their tools
without noise. In the event of a working party turning into file (or
about), the handles of the tools will before turning be brought into a
vertical position by lowering the iron part of the pick, and raising
the iron part of the shovel, resuming the trail when the turn is
complete. When marching in file, the handles will incline outwards.
4. _Extension._--Working parties will be extended by one of the
following methods:--
(i) The party will be extended to such interval as may be
required, about 12 paces in rear of the proposed trench.
It will then be advanced and halted, while an officer paces
along the front, halting at the limit of each man’s task.
(ii) The party will be brought up about 3 paces in rear of one
of the flanks of the proposed trench in file or single file,
according as one or two men are allotted to each task. An
officer will pace along the front, halting at the limit of
each task, the party moving off at the same time and wheeling
to the right or left, the men forming on the alignment in
succession in extended order by file, or single file, as
ordered. This method is especially suitable to night work.[7]
(iii) The right or left of each task will be marked by driving
in the pick according as the extension is from the right or
left. The shovel will be placed on the ground at right angles
to the pick (blade to the left). Each task will be
“spitlocked,” _i.e._, marked out by the pick, as soon as the
directing officer has fixed the outer limit of the task.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account