Instructions for the Management of Harvey's Sea Torpedo — John Shaqi
Instructions for the Management of Harvey's Sea TorpedoHarvey, Frederick
History
Instructions for the Management of Harvey's Sea Torpedo
Harvey, Frederick
Torpedoes
The ballast is composed of iron and sheet lead; the former, a fixture
to the wooden bottom of the torpedo; the latter, screwed on with long
screws into the iron. A thin sheet of lead is always kept on the
bottom, affording a soft material for moving them about on, removing
the objection that may be made to the friction caused by an iron bottom
in the moving of them in the torpedo-room. By taking out these screws,
several more thicknesses of sheet-lead can be screwed on, the same
screws binding all together. On leaving the manufacturers, there is
sufficient lead placed on the bottom for a speed between three and ten
knots. A very large increase of ballast would require another buoy to be
strung on over and above the usual complement.
[Illustration: (T)]
The proper adjustment of the slings is most important, as the divergence
depends upon it. The after legs of the slings, when stretched out
alongside the torpedo, should extend one foot beyond the stem iron of
the torpedo for the large torpedo, and eight inches for the small one;
the distance on the slings being reckoned from the seizing round the
thimble. This first adjustment is near enough if within two inches of the
regulation.
The thimble of the slings is made suitable for wire or hemp rope, the
fore surface of it being bell-mouthed, to prevent chafe of the tow-rope;
the thimble is so constructed that the parts of the slings cannot escape
from the groove should the seizing become slack; it will be observed that
by this arrangement the edge of the thimble is not brought in contact
when rounding the stem or stern of a vessel, the nip after leaving the
tow-rope coming direct on to the fore span, and thence to the projecting
curve of the side lever.
When all four legs are pulled out, in direction of the tow-rope, they
bear an equal strain; the junction of the four legs should be on a level
with the upper towing-irons, at the same time the upper fore span should
make an angle between 80° and 85° with the near side of the torpedo.
This arrangement gives the best divergence with the least strain on the
tow-rope, and is suitable when the torpedo is kept at short scope, as
well as when a long length of tow-line is out. The slings are made of
the best Italian hemp (not laid up too hard), the rope being of the same
strength as the tow-rope; for although in towing four legs divide the
strain, yet during collision the strain might be brought on one or two.[2]
[2] It may be here remarked, the small rudder on the stern of the torpedo
is not for the purpose of increasing the divergence, but to control the
direction of the torpedo when the tow-rope is suddenly slacked.
[Illustration: (U)]
[Illustration: (V)]
The tow-rope for large torpedo can be of 2½ in. or 3 in. hemp, or 1½ in.
flexible galvanized iron wire. For small torpedo, 1½ in. to 2 in. hemp,
or ⅞ in. wire.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account