Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements — John Shaqi
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvementsBellasis, E. S. (Edward Skelton)
Science
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements
Bellasis, E. S. (Edward Skelton)
Canals; Irrigation
it--supposing the features of the country admit of this--will be
desirable. It may increase the length of distributaries taken off near
the bends. It will be shown (CHAP. II. Art. 10) that a distributary
ought, when matters can be so arranged, to irrigate the country for two
miles on either side of it, and watercourses should be two or three
miles long. A distributary need not therefore extend right up to the
boundary of the commanded area but stop two or three miles from it.
Generally it is not desirable to prolong a distributary and make it
“tail” into another channel (CHAP. II. Art. 3). A distributary, like a
canal, may give off branches.
None of the rules mentioned in the preceding paragraph are intended to
be other than general guides, to be followed as far as the physical
features of the country permit, or to assist in deciding between
alternative schemes. It may for instance be a question whether to
construct one distributary or two, between two nearly parallel branches.
The two-mile rule may enable the matter to be decided or it may
influence the decision arrived at as to the exact alignments of the
branches. The flatter the country and the less marked the ridges the
more the alignment can be based on the above rules. Sometimes, as in the
low land adjoining a river, the ridges are ill defined or non-existent
and the alignment is based entirely on the above rules. The rule as to
following high ground need not be adhered to at the tail of any
distributary if all the land to be irrigated at the tail is low and if
there is a deep drainage line or other feature of the country such as to
preclude the possibility of an extension of the distributary. Possible
extensions should always be considered. In hilly districts an irrigation
canal may have to run in sidelong ground along the side of a valley.
In flat valleys, owing to the land nearest the river having received
successive deposits of silt in floods, the ground generally slopes away
from the river and a canal can irrigate the low land even if taken off
at right angles to the river. But to irrigate the high land near the
river and the land where it rises again towards the hills or watershed,
a canal taking off higher up the river is necessary. Of course much
depends on whether the canal is to irrigate when the river is low or
only when it is high, and whether or not there is to be a weir in the
river. In Upper Egypt, it is common for a high level canal taking off
far upstream, to divide into two branches, one for the land near the
river and one for the land towards the watershed, and for both branches
to be crossed--by means of syphons--by a low-level canal which irrigates
the low ground. Similar arrangements sometimes occur on Indian
inundation canals.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account