Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvementsBellasis, E. S. (Edward Skelton)
Science
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements
Bellasis, E. S. (Edward Skelton)
Canals; Irrigation
On inundation canals the water at a regulator is sometimes headed
up,--all branches being partially closed--in order to give more water to
outlets in the upstream reach. There are even some regulators--or rather
stop-dams--constructed solely for this purpose at places where there is
no bifurcation of the canal or distributary. Any such heading up should
be planned out beforehand and days for it fixed, and also the gauge
reading. If the water, without any heading up, rises to the needful
height on the gauge, nothing has to be done. There are also places on
inundation canals where the land is high and is only irrigable during
floods. At such places it is usual, on some canals, to allow the people
to make cuts in the bank when the water attains a certain height. Owing
to the high level of the country, nothing in the nature of a breach can
occur. In one canal division where the above arrangement was in force,
the people used to send applications to the Executive Engineer for leave
to cut the banks. This resulted in much delay. A list was prepared
showing exactly where the banks might be cut, the people were informed
and the formalities were much reduced.
6. =Extensions and Remodellings.= An existing canal or distributary may
need remodelling for various reasons, and in various degrees. If the
velocity is too high and the bed has scoured, or the sides have fallen
in, it may be necessary to raise the crests of falls, or to construct
intermediate weirs, or to widen the channel and reduce the depth. If the
command is not good it may be necessary to regrade the channel. If silt
deposit occurs, the cross-section of the channel may have to be altered,
to give a better relation between D and V. If there is surplus water,
extensions or enlargements of channels may be desirable and these can
sometimes be undertaken to a moderate extent merely by restricting a
somewhat too lavish supply to existing distributaries. If the water
level is dangerously high it may have to be lowered, or the banks raised
and strengthened. Sometimes it is desirable to cut off bends either to
shorten the channel and gain command or because the bends are sharp and
cause falling in of the banks or, if numerous, silting. In all cases the
general principles are the same as for entirely new projects, but
certain details require consideration.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account