Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvementsBellasis, E. S. (Edward Skelton)
Science
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements
Bellasis, E. S. (Edward Skelton)
Canals; Irrigation
The distributaries of the older canals were constructed before Kennedy’s
laws regarding silting were known, and it has been necessary to remodel
many of them. In some cases the gradient was wrong, in others the
cross-section.[33] In some cases a distributary ran in rather low
ground, and it was proposed to abandon it and construct a new one on
high ground. It was however pointed out by Kennedy (_Punjab Irrigation
Paper No. 10_, “Remodelling of Distributaries on old Canals,”) that
irrigation had become established along the course of the distributary,
that most of it would remain there and that a new alignment would result
in increased length of watercourses. Such distributaries have therefore
been allowed to remain very much as they were.
[33] The difficulty of reducing the size of a channel which is too
large is well known and has been discussed in _River and Canal
Engineering_, Chapter VIII. It is there explained that a moderate
reduction of width can be effected by “bushing,” but that for great
reductions, groynes or training walls are necessary. When the bed of a
distributary is too low it has been suggested that it could be raised
by filling in earth in each alternate length of 500 feet, and leaving
the rest to silt, but this would be expensive.
Remodelling should not be considered piecemeal, but regard should be had
to the whole channel. When a distributary is remodelled the outlets
should of course be dealt with as well as the channel. The chief thing
to consider is not whether the channel as it exists is exactly as it was
originally designed to be, but how it is doing its work and what kind of
alteration it needs. Even when a simple silt clearance or berm cutting
of a channel has to be undertaken, the work need not always consist in
blindly restoring the channel to its original condition. It may be both
feasible and desirable to remodel it to a slight extent, lowering the
water for instance in reaches where the outlets draw off very good
supplies and thus benefiting less fortunate reaches lower down.
The irrigation boundaries of the extended or remodelled channel should
as far as possible follow drainages, but these are not always important
or pronounced. The actual irrigation boundaries should be shown and also
those of any neighbouring channels of other canals, and any suitable
adjustments should be made.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account