2. =Areas and Discharges.= The figures on which the discharges in the
Triple Project are based form a useful and interesting object lesson. In
order to obtain sufficient water in the winter, it is necessary to
reduce the rabi supply to the existing Lower Jhelum Canal. The figure
above given for the Jhelum indicates the supply available after the
reduction. More water will be supplied to the Lower Jhelum Canal for the
kharif, the canal being enlarged for this purpose, and its total
irrigation will be unaffected. The proportion of the culturable
commanded area to be irrigated in the new tracts is 75 per cent., but
from this the area irrigated by wells in the Upper Jhelum and Upper
Chenab tracts is deducted. On the Lower Bari Doab Canal there is little
well Irrigation, but there are some low-lying tracts near the rivers,
and of these only 50 per cent. will be irrigated. The kharif and rabi
areas are in all cases to be equal.
The areas to be irrigated in each crop are as below--
Lower Jhelum Canal 383,091 acres
Upper Jhelum Canal 172,480 „
Upper Chenab Canal 324,184 „
Lower Bari Doab Canal 441,264 „
---------
Total 1,321,019 „
The total, excluding the existing Lower Jhelum Canal, is 937,928 acres.
With an equal area in the other crop, the new annual irrigation amounts
to 1,875,856 acres.
The kharif duty is taken as 100 acres at the distributary heads, this
being about the figure actually obtained on the Lower Chenab and Upper
Bari Doab Canals, and the required kharif discharges at the distributary
heads are:
Lower Jhelum 3,821 c. feet per second
Upper „ 1,725 „ „
„ Chenab 3,242 „ „
Lower Bari Doab 4,413 „ „
-----
Total, excluding Lower Jhelum 9,380 „ „
The losses of water in canal and branches have been found to be, on the
Upper Bari Doab Canal 10 c. feet per second, and on the Lower Chenab
Canal 8 c. feet per second, per million square feet of wetted area
respectively. The conditions of the latter canal most resemble those on
the new canals under consideration. The losses calculated on the wetted
areas of the channels, as designed, at 8 c. feet per second per million
square feet, are as follows, in c. feet per second:
Lower Jhelum Canal 624} 1,288
Upper Jhelum Canal 664}
Upper Chenab Canal 1,161} 2,126
Lower Bari Doab Canal 965}
-----
Total 3,414
But in dry years the canals will be worked in rotation during the rabi,
the Upper Chenab and Lower Bari Doab Canals being worked together, and
the Upper Jhelum and Lower Jhelum together.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account