At Flat River (where the deposits lie at much greater depths, some
being over 500 ft.) the shafts are 7 × 14 ft., 6½ × 18 ft., and 7 × 20
ft. These larger dimensions give room not only for two cage-ways and a
ladder-way, but also for a roomy pipe-compartment. The large quantities
of water to be pumped in this part of the district make the care of
the pipes in the shafts a matter of first importance. At Bonne Terre
only such a quantity of water was encountered as could be handled by
bailing or be taken out with the rock; there the only pipe necessary
was a small air-pipe down one corner of the shaft. When the quantity
of water encountered is so great that the continued working of the mine
depends upon its uninterrupted removal, the care of the pipes becomes a
matter of great importance. A shaft which yields from 4000 to 5000 gal.
of water per minute is equipped with two 12 in. column pipes and two 4
in. steam pipes covered and sheathed. Moreover, the pipe compartment
will probably contain an 8 in. air-pipe, besides speaking-tubes, pipes
for carrying electric wires, and pipes for conducting water from upper
levels to the sump. To care for these properly there are required a
separate compartment and plenty of room.
Shafts are sunk by using temporary head frames and iron buckets of from
8 to 14 cu. ft. capacity. Where the influx of water was small, 104 ft.
have been sunk in 30 days, with three 8 hour shifts, two drills, and
two men to each drill; 2¾ in. drills are used almost exclusively; 3¼
in. drills have been used in sinking, but without apparent increase in
speed.
The influence of the quantity of water encountered upon the speed of
sinking (and the consequent cost per foot) is so great that figures are
of little value. Conditions are not at all uniform.
At some point (usually before 200 ft. is reached) a horizontal opening
will be encountered. This opening invariably yields water, the amount
following closely the surface precipitation. It is the practice to
establish at this point a pumping station. The shaft is “ringed” and
the water is directed into a sump on the side, from which it is pumped
out. This sump receives also the discharge of the sinking pumps.
The shafts sunk in solid limestone require no timbering other than that
necessary to support the guides, pipes, and ladder platforms. These
timbers are 8 × 8 in. and 6 x 8 in., spaced 7 or 8 ft. apart.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account