In this connection it is worth while making a note of the increasing
tendency of lead smelters to provide much more powerful blowers than
were formerly considered necessary, due, no doubt, in large measure to
the recognition of the greater loss of air by leakage backward at the
pressure now worked against. It is considered, for example, that a 42 ×
140 in. furnace to be driven under 40 oz. pressure should be provided
with a No. 10 blower, which size displaces 300 cu. ft. of air per
revolution and is designed to be run at about 100 r.p.m.; its nominal
capacity is, therefore, 30,000 cu. ft. of air per minute; although
its actual delivery against 40 oz. pressure is much less, as pointed
out by Mr. Raht and Mr. Bretherton. The Connersville Blower Company,
of Connersville, Ind., lately supplied the Aguas Calientes plant (now
of the American Smelting and Refining Company) with a rotary blower
of the above capacity, and duplicates of it have been installed at
other smelting works. The force required to drive such a huge blower
is enormous, being something like 400 h.p., which makes it advisable
to provide each blower with a directly connected compound condensing
engine.
In view of the favor with which cylindrical blowing engines for driving
lead blast furnaces are held by many of the leading lead-smelting
engineers, and the likelihood that they will come more and more into
use, it will be interesting to observe whether the lead smelters will
take another step in the tracks of the iron smelters and adopt the
circular form of blast furnace that is employed for the reduction
of iron ore. The limit of size for rectangular furnaces appears to
have been reached in those of 42 × 145 in., or approximately those
dimensions. A furnace of 66 × 160 in., which was built several years
ago at the Globe plant at Denver, proved a failure. H. V. Croll at
that time advocated the building of a circular furnace instead of the
rectangular furnace of those excessive dimensions and considered that
the experience with the latter demonstrated their impracticability. In
the _Engineering and Mining Journal_ of May 28, 1898, he stated that
there was no good reason, however, why a furnace of 300 to 500 tons
daily capacity could not be run successfully, but considered that the
round furnace was the only form permissible. We are unaware whether
Mr. Croll was the first to advocate the use of large circular furnaces
for lead smelting, but at all events there are other experienced
metallurgists who now agree with him, and the time is, perhaps, not far
distant when they may be adopted.
ROTARY BLOWERS VS. BLOWING ENGINES
BY J. PARKE CHANNING
(June 8, 1901)
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account