To follow the argument to its conclusion, let us imagine for the moment
that the East Helena plant were arranged on the terrace system, with
the furnace tops on a level with the floor of the ore-bins. Certain
precautions being observed, the spreader would give as good results
with small units of charge delivered by buggies as it now does with the
large units delivered by the charge-car, and the expense of delivery
to the furnaces would be practically no more than it now is to the
charge-car pit. The furnace top would, of course, have to be arranged
so that the buggies, in discharging, could be drawn along the slot,
so as to give the necessary longitudinal distribution parallel to the
furnace walls, just as is now done in filling the charge-car. The ends
of the spreader, if built like a hipped roof, would secure proper
feeding of the front and back.
Thus, by eliminating the charge-car, and with it the necessity for
powerful hoisting machinery, with its expensive repairs and operating
costs, we may greatly simplify the problem of mechanical feeding, and
open the way for the adoption of successful automatic feeding in many
existing plants where it is now considered impracticable.
COST OF SMELTING AND REFINING
BY MALVERN W. ILES
(August 18, 1900)
In the technical literature of lead smelting there is a lamentable lack
of data on the subject of costs. The majority of writers consider that
they have fulfilled their duties if they discuss in full detail the
chemical and engineering sides of the subject, leaving the industrial
consideration of cost to be wrought out by experience. When an engineer
or metallurgist collects data on the costs involved in the various
smelting operations, he generally hesitates to give this special
information to the public, as he regards it as private, or reserves it
as stock in trade to be held for his own use.
The following tables of cost have been compiled from actual results
of smelting and refining at the Globe works, Denver, Colo., and are
offered in the hope that they will prove a valuable addition to the
literature of lead smelting. These results are offered tentatively,
and, while true for the periods stated, they require considerable
adjustment to meet the smelting conditions of the present time.
COST OF HAND-ROASTING PER TON (2000 LB.) OF ORE
1887 $3.975
1888 4.280
1889 4.120
1890 3.531
1891 3.530
1892
1893
1894 3.429
1895 2.806
1896 2.840
1897 2.740
1898 2.620
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account