Lead Smelting and Refining, With Some Notes on Lead Mining
Science
Lead Smelting and Refining, With Some Notes on Lead Mining
Lead -- Metallurgy; Lead mines and mining
Outside of these five districts, the most of the lead produced in the
United States is derived from other camps in Idaho, Colorado, Missouri
and Utah, the combined output of all other States being insignificant.
It is interesting to examine the conditions under which lead is
produced in the five principal districts.
_Leadville, Colo._—The mines of Leadville, which once were the largest
lead producers of the United States, became comparatively unimportant
after the exhaustion of the deposits of carbonate ore, but have
attained a new importance since the successful introduction of means
for separating the mixed sulphide ore, which occurs there in very large
bodies. The lead production of Leadville in 1897 was 11,850 tons;
17,973 tons in 1898; 24,299 tons in 1899; 31,300 tons in 1900; 28,180
tons in 1901, and 19,725 tons in 1902. The Leadville mixed sulphide ore
assays about 8 per cent. Pb, 25 per cent. Zn and 10 oz. silver per ton.
It is separated into a zinc product assaying about 38 per cent. Zn and
6 per cent. Pb, and a galena product assaying about 45 per cent. Pb, 10
or 12 per cent. Zn, and 10 oz. silver per ton.
_Cœur d’Alene._—The mines of this district are opened on fissure veins
of great extent. The ore is of low grade and requires concentration. As
mined, it contains about 10 per cent. lead and a variable proportion
of silver. It is marketed as mineral, averaging about 50 per cent. Pb
and 30 oz. silver per ton. The production of lead ore in this district
is carried on under the disadvantages of remoteness from the principal
markets for pig lead, high-priced labor, and comparatively expensive
supplies. It enjoys the advantages of large orebodies of comparatively
high grade in lead, and an important silver content, and in many cases
cheap water power, and the ability to work the mines through adit
levels. The cost of mining and milling a ton of crude ore is $2.50 to
$3.50. The mills are situated, generally, at some distance from the
mines, the ore being transported by railway at a cost of 8 to 20c.
per ton. The dressing is done in large mills at a cost of 40 to 50c.
per ton. About 75 per cent. of the lead of the ore is recovered. The
concentrates are sold at 90 per cent. of their lead contents and 95 per
cent. of their silver contents, less a smelting charge of $8 per ton,
and a freight rate of $8 per ton on ore of less than $50 value per ton,
$10 on ore worth $50 to $65, and $12 on ore worth more than $65; the
ore values being computed f. o. b. mines. The settling price of lead is
the arbitrary one made by the American Smelting and Refining Company.
With lead (in ore) at 3.5c. and silver at 50c., the value, f. o. b.
mines, of a ton of ore containing 50 per cent. Pb and 30 oz. silver is
approximately as follows:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account